Laserfiche WebLink
San Joaquin Count;1 L t? - <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95M$ :0 2016 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />Aboveground Petroleum Storage A oti�Re` rt .I -H <br />Facility Name: <br />NUCAL TRANSPORT SERVICES <br />Facility Phone <br />209 254-2200 <br />Date: <br />March 04, 2016 <br />Facility Address: <br />720 S STOCKTON AVE, RIPON, CA 95366 <br />CERS ID: <br />10184685 <br />Inspection Contact: <br />Randy Joaquin <br />Title <br />Fleet Maintenance Manager <br />Phone: <br />209 254-2226 <br />Inspection Type: <br />ROUTINE INSPECTION - Operating Permit <br />Program: <br />2832 - AST FAC 10 K- </=100 K GAL CUMULATIVE <br />Consent For: <br />O Inspection Z Photos 0 Samples <br />Consent Given By: <br />I Randy Joaquin, Fleet Maintenance Manager <br />CCR = California Code of Regulations HSC = Health and Safety Code CFR = Code of Federal Regulations <br />V = Violatron R = Repeat violation COS = Corrected on site during nspect;en <br />Aboveground Petroleum Storage Act <br />101 <br />HSC 25270.4.5(a) <br />Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 <br />o V ❑ R ❑ COS <br />102 <br />HSC 25270.4.5(a) <br />Failed to properly close a tank that is considered permanently closed <br />❑ V ❑ R c COS <br />103 <br />HSC 25270.6(a) <br />Failed to file Business Plan or annual facility tank statement if capacity is over 10.000 gallons <br />❑ V n R c COS <br />104 <br />HSC 25270.6(b) <br />Failed to submit APSA fees <br />in V - R c COS <br />105 <br />HSC 25270.8 <br />Failed to report spills or releases of 42 gallons (one barrel) or more <br />❑ V _ R r- COS <br />V R ❑ COS <br />106 <br />CCR 25185(c)(3) <br />Faded to submit a written response within 30 days of receiving an inspection report <br />107 <br />HSC 25404(e)(4) <br />Failed to report program data electronically <br />V R r COS <br />Requirement to Prepare and Implement a SPCC Plan <br />201 <br />CFR 112.3(4; <br />Plan certification by a Professional Engineer (PE) missing or incomplete <br />■ V R COS <br />202 CFR 112.3(,)(1) <br />Failed to maintain a copy of the Plan on site <br />_ V H COS <br />Amendment of SPCC Plan by Owners or Operators <br />301 <br />CFR 112.5(a) <br />Failed to amend Plan as necessary <br />■ V = R - COS <br />302 <br />CFR 112.5(b) <br />Failed to review Plan once every five years and/or implement any resulting amendments <br />= V _ R COS <br />303 <br />CFR 112.5(c) <br />Failed to have a PE certify technical amendments <br />■ V _R. —COS <br />General Requirements for SPCC Plans <br />601 <br />CFR 112.7 <br />Plan that does not follow the sequence specified In this section lacks a cross-referencing section <br />o V o R u COS <br />602 <br />CFR 112.7 <br />Plan lacks approval of management to fully commit the necessary resources to implement the Plan <br />V o R n COS <br />603 <br />CFR 112.7(a)(2) <br />Plan failed to discuss equivalent environmental protection if applicable <br />- V n R e COS <br />604 <br />CFR 112.7(a)(3) <br />No facility diagram or didn't show location and contents of containers, transfer stations, and pipes <br />■ V R ❑ COS <br />605 <br />CFR 112.7(,)(3) <br />Plan failed to address facility layout, operations discharge prevention methods and containers <br />e V e R COS <br />606 <br />CFR 112.7(a)(4) <br />Plan failed to contain procedures for repotting a discharge <br />- V o R _ COS <br />607 <br />CFR 112.7(a)(5) <br />Discharge procedures are not adequately addressed if the facility has no response plan <br />= V ❑ R c COS <br />608 <br />CFR 112.7(b) <br />Plan failed to include a description of potential equipment failure or provide equivalence <br />V ❑ R ❑ COS <br />609 <br />CFR 112.7(c) <br />Failed to provide secondary containment, diversionary structures, or equipment to prevent discharge <br />❑ V o R ❑ COS <br />610 <br />CFR 112.7(d) <br />Full or partial PE certified Plan failed to explain impracticability <br />❑ V ❑ R ❑ COS <br />611 <br />CFR 112.7(4)(1) <br />Full or partial PE certified Plan failed to include spill contingency if no response plan submitted <br />e V e R r, COS <br />612 <br />CFR 112.7(d)(2) <br />No written commitment of manpower, equipment, and materials to control and remove oil discharge <br />❑ V in R ❑ COS <br />613 <br />CFR 112.7(e) <br />Failed to conduct inspections or maintain records for 3 years <br />■ V - R r COS <br />Page 1 of 6 <br />