My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
720
>
2800 - Aboveground Petroleum Storage Program
>
PR0528050
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 10:46:20 AM
Creation date
9/14/2018 2:34:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528050
PE
2832
FACILITY_ID
FA0014456
STREET_NUMBER
720
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25936028
CURRENT_STATUS
01
SITE_LOCATION
720 S STOCKTON AVE
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sogov.orcl/ehd <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />Facility Address: <br />Date: <br />NUCAL TRANSPORT SERVICES <br />720 S STOCKTON AVE RIPON <br />March 04 2016 <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br />725 <br />CFR 112.8(d)(3) <br />Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction <br />❑ V ❑ R ❑ COS <br />726 <br />CFR 112.8(d)(4) <br />Failed to regularly inspect aboveground valves, piping, and appurtenances <br />i_: V ❑ R ❑ COS <br />727 <br />CFR 112.8(d)(4) <br />Failed to conduct integrity and leak test on buried piping any time it is worked on <br />❑ V ❑ R ❑ COS <br />728 <br />CFR 112.8(d)(5) <br />Failed to adequately warn vehicles entering facility to protect piping and other transfer operations <br />❑ V ❑ R ❑ COS <br />Other Violations <br />4010 <br />See below <br />Unlisted Administration/Documentation violation <br />c V ❑ R ❑ COS <br />4020 <br />See below <br />Unlisted Training violation <br />❑ V ❑ R ❑ COS <br />4030 <br />See below <br />Unlisted Operations/Maintenance violation <br />❑ V ❑ R ❑ COS <br />4040 <br />See below <br />Unlisted Release/Leaks/Spills violation <br />❑ V ❑ R ❑ COS <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />201 <br />CFR 112.3(d) Plan certification by a Professional Engineer (PE) missing or incomplete. <br />The Professional Engineer (PE) is incomplete. The PE certification didn't state that he or his agents have visited the <br />facility. The PE certification must include all of the aspects in 40 CFR 112.3(d)(1), including attesting that the PE is <br />familiar with 40 CFR Part 112, he or his agent has visited and examined the facility, the Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan has been prepared in accordance with good engineering practice, including <br />consideration of applicable industry standards, procedures have been established for required inspections and testing, <br />and the Plan is adequate for the facility. Immediately obtain a complete PE certification for the facility's SPCC Plan. <br />Submit a copy of the completed certification to the EHD. <br />This is a Class II violation. <br />301 <br />CFR 112.5(a) Failed to amend Plan as necessary. <br />The following deviations from the written SPCC plan were noted at the time of inspection: <br />1) According to Mr. Joaquin, a 240 -gallon temporary transfer diesel tank was removed from the facility (taken back to <br />the owner of the tank, it was a rental equipment). <br />2) The written SPCC plan indicates that fuel deliveries are only conducted during business hours, Mr. Randy Joaquin <br />indicated that deliveries are sometimes conducted after business hours. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan must be amended when there is a change in the <br />facility design, construction, operation, or maintenance that materially affects its potential for a discharge, within 6 <br />months of the change, and implemented as soon as possible, not later than 6 months following preparation of the <br />amendment. Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures <br />and policies currently in place at the facility. <br />This is a minor violation. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.