My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 4:06:05 PM
Creation date
9/19/2018 2:57:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VF UNIFIED PROGRAM CONSOLIDATED FO <br />UNDERGROUND STORAGE TANK <br />ONITORING PLAN - (Pae 1 of 2) <br />TYPE OF ACTION ❑ I. NEW PLAN Z. CHANGE OF INFORMATION <br />490.1 <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(.S.)- <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) _ <br />I <br />BUSINESS NAME (Same as FACILITY NAME) <br />3. <br />BUSINESS SITE ADDRESS Z/jgoZIA C 103 <br />CITY s��� 2i�N <br />104. <br />II. EQUIPMENTS TE TING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR 2632 2634, 2638 264 1) <br />MONITORING EQUIPMENT IS SERVICED A <br />L NNUALLY F-199.OTHER (Specify): <br />490-3a <br />4903b <br />M. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. . SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)4904 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490-6 <br />PANEL MANUFACTURER: L1kx10V&t i IXI J- 4907, <br />MODEL #: <br />490-8 <br />LEAK SENSOR MANUFACTURER: 4909, <br />MODEL #(S): - u <br />490-10 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-11 MODEL #: <br />49013 <br />IN -TANK PROBE MANUFACTURER: 49014. MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />49018 <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490.20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />490-21 <br />490-22 <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />49023 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />490.24 <br />490-25 <br />❑ 99. OTHER (Specify): <br />490-26 <br />490-27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490 -28 - <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: OR91DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />49029 <br />PANEL MANUFACTURER: 11kx % LCI`% 490-30 MODEL #: 3 (-) L) <br />490-31 <br />LEAK SENSOR MANUFACTURER: It 4131 MODEL #(S): ; ) <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. a. YES ❑ b. NO <br />49034 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. OK.. YES ❑ b. NO <br />49035 <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 <br />49036 <br />MLLD MANUFACTURER(S): 490-37 MODEL #(S): <br />49038 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />49039 <br />ELLD MANUFACTURER(S) 4900 MODEL #(S): <br />490-41 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />45542 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490.43 <br />ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-44 <br />❑ 4. PIPE INTEGRITY TESTING 49045 <br />TEST FREQUENCY a. ANNUALLY b. EVERY 3 YEARS c. OTHERS i 490.46490-47 <br />El5. VISUAL PIPE MONITORING. <br />490.48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED- <br />490.49 <br />• Allowed for monitoring of unburied emergency meraw fuel piping ordy pa HSC 25281.5(6 3) <br />6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR §2636(a)(3)1. <br />490-50 <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />49051 <br />❑ 99. OTHER (Specify) <br />09081 <br />49053 <br />UPCF UST -D (12/2007) 1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.