Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORMW <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />I. USC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54& <br />1. CONTINUOUS ELECTRONIC MONITORING El2. FLOAT AND CHAIN ASSEMBLY 113. ELECTRONIC STAND-ALONE 490.546 <br />❑ 4. NO DISPENSERS 119 9.OTHER(S ci ): <br />PANEL MANUFACTURER: ?. T /✓% 49° 55 <br />MODEL #: 06% 490-56 <br />LEAK SENSOR MANUFACTURER: 'f 490'57 <br />1 MODEL #(S): 490.58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a. ES ❑ b. NO 490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN YES ❑ b. NO 490-60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. M� `aYES ❑ b. NO 490.61 <br />UDC MONITORING STOPS TH LOW OF PRODUCT AT THE DISPENSER Uk. YES ❑ b. NO 4.61 <br />2. UDC CONSTRUCTION IS 1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 490-63 <br />IF DOUBLE WALLED: 490.64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 1. LIQUID 0 2. PRESSURE 0 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490'641 <br />VII. PERIODIC SYSTEM TESTING <br />1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br />D EC ION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />tSECL ONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br />SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br />VIII. RECORDKEEPING <br />ollowing monitoring/maintenance records are kept for this facility: <br />Alarm logs 49"ga ❑ Visual Inspection Records 490.686 ❑ Tank integrity testing results 490b9e <br />❑ SIR testing results (and supporting documentation records). 490-68d ❑ Tank gauging results (and supporting documentation records). 490-68e <br />Testing results (and supporting documentation records). 49o.68r ❑ Corrosion Protection 60 -day logs 490-6sg <br />❑,�, <br />�ATG <br />ffquipment maintenance and calibration records. 49M8h <br />IX. TRAINING <br />Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69a <br />REFE$ENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />[!] IS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490-69b <br />OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 49o -69e <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.690- <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g <br />JQ OTHER (Specify): M69h, M691 <br />This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />Names of contact person(s) for emergencies and monitoring alarms. 490.70 <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />c /z,< /—/Zy' --:: -74111y- ", <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The followin rson(s) are responsible,for performing the monitoring and equipment maintenanc : <br />NAME --L — XV L' � 490-72 TITLE L G T/� ��� 0-900-5 <br />NAME 3 /Y1/-� / 490-74 TITLE 4900-5 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII.OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 490-76 <br />DATE: 490-77 <br />RURESENTING 0 1. JAnkr/ r <br />78APPLICANT <br />0-900-9 <br />APPLICAtIT TITLE: <br />UPCF UST -D (12/2007) 3/4 <br />