Laserfiche WebLink
SWRCB, January 2002 Page 3 . <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />MX <br />❑ <br />Tank Manufacturer F-1 Industry Standard ❑ Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />❑% <br />❑ <br />Pressure Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Piping Run # 1 d91 piping Rim # <br />Equipment Resolution: <br />Piping Run # Pipiug Ruo # <br />Piping Material: <br />fiberglasss <br />Piping Manufacturer: <br />smith <br />Piping Diameter: <br />311 <br />Length of Piping Run: <br />2 0 ' <br />Product Stored: <br />dsl <br />Method and location of <br />piping -run isolation: <br />dsl <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />Test Start Time: <br />10:55 <br />Initial Reading (Rt ): <br />3 psi <br />Test End Time: <br />11:55 <br />Final Reading (RF ): <br />3 psi <br />Test Duration: <br />1 hr <br />Change in Reading (RF - I I ): <br />0 psi <br />Pass/Fail Threshold or <br />Criteria: <br />0 psi <br />Test Result:' <br />Pass 1:1 Fail <br />Pass Fail <br />Pass Fail <br />Pass Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />