Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 4. <br />Test Method Developed By: <br />F-1 <br />El <br />Sump Manufacturer El Industry Standard Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />❑ <br />Pressure F1Vacuum Hydrostatic <br />Other (Spec) <br />Test Equipment Used: <br />Sump # 1 Sump # <br />Equipment Resolution: <br />Sump # Sump # <br />Sump Diameter: <br />4 8 " <br />Sump Depth: <br />2211 <br />Sump Material: <br />fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Pentration: <br />1011 <br />Height from Tank Top to Lowest <br />Electrical Pentration: <br />10 <br />Condition of sump prior to testing: <br />good <br />Portion of Sump Tested: 1 <br />1211 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />X�Yes [:]No❑N <br />Yes ❑No[:]N <br />DYes DNo❑N <br />❑ Yes EINo❑h1A <br />Turbine shutdown response time: <br />2-5 sec s <br />Is system programmed for fail-safe <br />shutdown?* <br />Yes N N <br />❑ � <br />Yes N N <br />❑ � <br />Yes N N <br />[:]Yes❑ � <br />Yes No <br />[—]Yes❑ <br />Was fail-safe verified to be <br />operational?* <br />F__1 Yes N N <br />❑ � <br />Yes N N <br />[:]Yes❑ � <br />Yes N N <br />❑ ❑ � <br />X ❑ Yes o A <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min <br />Test Start Time: <br />11: 0 9 <br />Initial Reading (R1): <br />2 .926 <br />Test End Time: <br />11:3 9 <br />Final Reading (RF ): <br />2.911 <br />Test Duration: <br />30 min <br />Change in Reading (RF - R1 ): <br />0 0lgph <br />Pass/Fail Threshold or Criteria: <br />05 gph <br />Test Result: <br />� Pass D Fail <br />❑ Pass 0 Fail <br />❑ Pass ❑ Fail <br />❑ Pass El Fail <br />Was sensor removed for testing? <br />li]YesE:]N <br />NA <br />Yes <br />NoF]NA <br />[_]Yes[:]Nc[�]NA <br />L] Yes E]No[:]NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />Ye N NA <br />Lfl� � <br />Ye N NA <br />❑ � <br />Ye N NA <br />❑ � <br />Yes N <br />❑ <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />starting and ending values are taken off t e vp t <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />