My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO_2007 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:52:26 PM
Creation date
9/20/2018 9:29:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2017
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page 5 . <br />Test Method Developed By: <br />F-1 <br />❑ <br />UDC Manufacturer Industry Standard UX Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />FI <br />Pressure ❑ Vacuum ❑x Hydrostatic <br />Other (Specify) <br />Test Equipment Used: vp1t <br />Equipment Resolution: . 05gph <br />UDC # ds 1 <br />western <br />UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />UDC Material: <br />fiberglass <br />UDC Depth: <br />2511 <br />Height from UDC Top to Top of <br />Highest Piping Pentration: <br />101, <br />Height from UDCTop to Lowest <br />Electrical Pentration: <br />711 <br />Condition of UDC prior to testing: <br />good <br />Portion of UDC Tested: 1 <br />1211 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Eyes ❑No❑NA <br />❑Yes ❑No❑N <br />UYes ❑No❑N <br />Yes []NOUN <br />Turbine shutdown response time: <br />2-5 sec s <br />Is system programmed for fail-safe <br />shutdown?* <br />Yes N N <br />❑ � <br />❑ ❑ ^ <br />Yes NOUN <br />Yes N N <br />[:]Yes❑ � <br />Yes No <br />❑ ❑ <br />Was fail-safe verified to be <br />Wasoperfail-safe <br />%Yes N N <br />❑ ❑ � <br />Yes N <br />❑ [::]No[_ <br />% Yes N <br />❑ [:]N oo <br />No <br />[:]Yes ❑ <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min <br />Test Start Time: <br />11:11 <br />Initial Reading (111): <br />10.606 <br />Test End Time: <br />11:26 <br />Final Reading (RF ): <br />10.417 <br />Test Duration: <br />15 min <br />Change in Reading (R F - R1 ): <br />. 0 2 2 gph <br />Pass/Fail Threshold or Criteria: <br />. 05gph <br />Test Result: <br />o Pass Fail <br />Pass Fail <br />F]Pass El Fail <br />–]Pass ❑ Fail <br />Was sensor removed for testing? <br />Eyes�Nc�NA <br />Yes❑Nc�NA <br />�Yes�No❑NA <br />❑ Yes [:]No <br />Was sensor properly replaced and <br />verified functional after testing? <br />Ye N NA <br />0 � <br />Ye N NA <br />❑ � � <br />Ye N NA <br />� � <br />Yes N <br />❑ o[:] <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.