Laserfiche WebLink
SWRCB, January 2002 Page 3 . <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />Tank Manufacturer Industry Standard El Professional Engineer <br />Other (Sped) <br />Test Method Used: <br />M <br />Pressure F Vacuum E] Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping; Run # 1 dsl <br />fiberglass s <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />smith <br />Piping Diameter: <br />311 <br />Length of Piping Run: <br />2 0 ' <br />Product Stored: <br />dsl <br />Method and location of <br />piping -run isolation: <br />dsl <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />Test Start Time: <br />10:55 <br />Initial Reading (RI ): <br />3 psi <br />Test End Time. <br />11:55 <br />Final Reading (RF ): <br />3 psi <br />Test Duration: <br />1 hr <br />Change in Reading (RF - I I ): <br />0 psi <br />Pass/Fail Threshold or <br />Criteria: <br />0 psi <br />Test Result: <br />Pass D Fail <br />[:] Pass Fait <br />Pass Fail <br />Pass <br />Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />