Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Paoc 4 - <br />Test Method Developed By: <br />❑ <br />El <br />Sump Manufacturer El Industry Standard Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />FI <br />❑ <br />Pressure ❑ Vacuum Hydrostatic <br />Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />Sump # 1 <br />4 8 ' <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />Sump Depth: <br />2 2 " <br />Sump Material: <br />fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Pentration: <br />101, <br />Height from Tank Top to Lowest <br />Electrical Pentration: <br />10" <br />Condition of sump prior to testing: <br />good <br />Portion of Sump Tested: 1 <br />1211 <br />Does turbine shut down when <br />sump sensor detects liquid (bothX�yes <br />product and water)?* <br />�No❑N <br />Yes �No�N <br />Yes �No❑N <br />❑ Yes �No❑NA <br />Turbine shutdown response time: <br />2-5 sec s <br />Is system programmed for fail-safe <br />shutdown?* <br />Yes1:1 N N <br />� <br />Yes N N <br />❑ ❑ � <br />Yes N N <br />[:]Yes❑ � <br />Yes No <br />[:]Yes❑ L_I`� <br />Was fail-safe verified to be <br />operational?* <br />XElYes �No❑N <br />[:]Yes❑No❑N <br />E]Yes �NoDN <br />Yes �No�N <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min <br />Test Start Time: <br />11:09 <br />Initial Reading (R1): <br />2.926 <br />Test End Time: <br />11:39 <br />Final Reading (RF ): <br />2.911 <br />Test Duration: <br />3 0 min <br />Change in Reading (R F - R1 ): <br />0 01gph <br />Pass/Fail Threshold or Criteria: <br />.05 gph <br />Test Result: <br />� Pass ElFail <br />ElPassEl Fail <br />PassEl Fail <br />E]Pass 0 Fail <br />Was sensor removed for testing'? <br />E]Yes[_]NoDNA <br />L]YesENcE]NA <br />[_]l'es[�]No❑NA <br />[]Yes L:]N,a <br />Was sensor properly replaced and <br />verified functional after testing? <br />Ye N NA <br />0 so � <br />Ye N NA <br />❑ � <br />[:]Yes[:] N NA <br />Yes N <br />❑ ❑ <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />starting and ending values are taken off tFie vp t <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />