Laserfiche WebLink
SWRCB. January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br />Other (Specify) <br />Test Method Used: X Pressure Vacuum Hydrostatic <br />C! Other (Spec) <br />Test Equipment Used: Pressure Gauge in Psi/Nitrogen <br />1 <br />- Piping Run # 1 Piping Run # <br />Equipment Resolution: <br />Piping Run # <br />1/10 x 15 Psi <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />3" <br />Length of Piping Run: <br />Approx. 17' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at Piping <br />Sum <br />Wait time between applying <br />pressure and starting test: <br />IOMinutes <br />Test Start Time: <br />12:55 <br />Initial Reading (Ri): <br />3 Psi <br />Test End Time: <br />1:55 <br />Final Reading (RF): <br />3 Psi <br />Test Duration: <br />1 Hour <br />Change in Reading (RF-Rj): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable Loss <br />Test Result: <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Old Blue Line Test Boot on Secondary Pipe at UDC, prior to testing. <br />