Laserfiche WebLink
K. Float and Chain Equipment: ® Check this box if floats and chains are not present at this site. , <br />❑ Check this box if float and chain equipment is instal lei„bu.t .only as ,/ 1.� 9 ,. <br />secondary leak detection. <br />This section must be completed if floats and chains are used to perform leak detection monitoring. MAR 2 5 2016 <br />�jpf 111API <br />J,.�'Complete the following checklist:- <br />❑ Yes ❑ No* Were all float and chain equipment properly inspected and tested for correct functionality? <br />❑ Yes ❑ No* Were all float and chain equipment certified to be working properly? <br />* In the Section M, below, describe how and when these deficiencies were or will be corrected. <br />L. Impact Valves: ❑ Check this box if impact valves are not installed. <br />Complete the following checklist: <br />® Yes ❑ No* Were all impact valves properly inspected and tested for correct functionality? <br />® Yes ❑ No* Were all impact valves certified to be working properly? <br />* In the Section M, below, describe how and when these deficiencies were or will be corrected. <br />M. Comments: <br />Monitoring System Certification <br />