Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: VALLEY PACIFIC COUNTRY MARKET 1524 FRESNO AVENUE STOCKTON CA 95206 <br />I � � <br />MAR 2 5 2016 <br />V 19 <br />. ............ <br />..................... <br />.................................................. <br />. .... <br />.... ................................. <br />..... ................ <br />...... I <br />.......... <br />... ......... <br />. . . . . . . <br />..... <br />..... ...... <br />...... <br />..... <br />. . . . <br />........... <br />............... <br />..................................... <br />................. <br />.... <br />.. .. <br />I ................................... <br />..... .. <br />I ..... . ..... <br />I ......................... . <br />.......... <br />I ........ <br />...................... . <br />. ..... .. ........ ... <br />..... .. . . <br />................. ... <br />....................... . <br />. 1 . . . . . . 1. SAT . . <br />.... <br />. . . . . . 3 .' <br />_. <br />. . 2 SAT. <br />. . . . . LT <br />T <br />. . . <br />. . . . <br />VR208 <br />• . <br />. LgM..' <br />. C3. <br />C2. <br />G1.... <br />• . <br />.•0 • <br />... <br />VR <br />GILB <br />. . . <br />GILB <br />LB <br />. . . . <br />. . . . . . . . . . <br />4.....3SAT. <br />2. <br />..... <br />DSL.... <br />.. <br />.. <br />. ...... <br />. .. ... <br />...... <br />..... <br />... ....... I...... <br />....... .. <br />.. ... <br />.. L2... <br />. . VR420 <br />�• <br />....... <br />. <br />..... <br />.... <br />.................... <br />... <br />.........I <br />............... <br />. . . . . . <br />........................ <br />. . . . . . . . . <br />......................... <br />............................. <br />................. <br />............ <br />...... <br />... <br />....... <br />........ <br />...... <br />.... <br />.............. <br />I............ <br />.... <br />.. ....... <br />.. .. <br />...... ............ <br />................ <br />........ <br />.......... <br />..... ...... <br />..... I... <br />..... ... ..... <br />...... ... ..... <br />........................... <br />... ......... ESO <br />.......I <br />..... <br />. . . . . . . . <br />. . . . . . . <br />. . . . . . . . . <br />. . . . . . <br />. . . . . . . . . . . <br />...... <br />. .... <br />..... .... <br />.H12l�N <br />... .... ................. ... <br />VAPOR VO ANNULAR OA MONITOR a PIPING OP <br />FILL OF TURBINE OT VENT O ATG <br />Date map was drawn: 3 I -LI <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring <br />System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following <br />equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used <br />for leak detection). In the space provided, note the date this Site Plan was prepared. <br />