Laserfiche WebLink
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 24/27 <br />SWRCB, January 2002 <br />6. SECONDARY PIPE TESTING <br />Page I/ of 6 <br />Test Method Developed By: ❑ Piping Manufacturer x Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: x Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:4"dial gauge <br />Equipment Resolution:0-15 psi <br />Piping Run # 1-2 <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Plastic <br />Piping Manufacturer: <br />OP W <br />Piping Diameter: <br />1 '/2 " <br />Length of Piping Run: <br />70 ft. <br />IVIMIN <br />2015 <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot in STP sump <br />r''rA'r:",gip <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />Test Start Time: <br />11:45 <br />Initial Reading (Ri): <br />5.0 PSI <br />Test End Time: <br />12:45 <br />Final Reading (RF): <br />5.0 PSI <br />Test Duration: <br />1 hr <br />Change in Reading (RF -R): <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />0 PSI <br />Test Result: <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Received Time Mar,18. 2015 3:16PM No,8366 <br />