Laserfiche WebLink
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 26127 <br />61 <br />Q ECL— Y`� E® <br />SWRCB, January 2002 MAR 1 2015 <br />Page 6 of <br />R. PIPING SUMP TESTING <br />Test Method Developed Byf�NVIRONMU§VALS r�l� Acturer x Industry Standard ❑ Professional Engineer <br />PERMI VtQWcify) <br />Test Method Used: 0 Pressure ❑ Vacuum x Hydrostatic <br />❑ Other (Sped) <br />Test Equipment Used:Incon is-sts <br />Equipment Resolution:. 001" <br />Sump #Diesel <br />Sump <br />Sump <br />Sump <br />Sump Diameter: <br />48" <br />Sump Depth: <br />55" <br />Sump Material: <br />FRP <br />Height from Tank Top to Top of <br />Hi hest Piping Penetration: <br />38" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />18" <br />Condition of sump prior to testing: <br />good <br />Portion of Sump Tested' <br />1/2 <br />Does turbine shut down when <br />SUMP sensor detects liquid (both <br />roduct and water)?* <br />X Yes ❑ No ❑ <br />NA <br />❑ Yes 0 No ❑ NA <br />❑ Yes 0 No 0 NA <br />0 Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />3 sec <br />Is system programmed for fail-safe <br />shutdown?* <br />X Yes ❑ No O <br />NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />X Yes ❑ No 0 <br />NA <br />❑ yes 0 No ❑ NA <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No 0 NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 min. <br />Test Start Time: <br />11:39 <br />Initial Reading (Ri): <br />5.378 <br />Test End Time: <br />11:24 <br />Final Reading (RF): <br />5.378 <br />Test Duration: <br />15 min <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />Test Result:.. <br />X . Pass _ ❑ Fail <br />❑ Pass ❑ Fail <br />❑ :Pass, p -Fait <br />❑ Pass ❑ Fail. <br />Was sensor removed for testing? <br />X Yes NOANo 0 <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes []No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />X Yes ❑ No ❑ <br />NA <br />❑ Yes ❑ No ❑ NA <br />U Yes ❑ No ❑ NA <br />0 Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />Received Time Mar,18. 2015 3:16PM No.8366 <br />