Laserfiche WebLink
Secondary Containment Testing Report Form - Page 4 of 5 <br />H. Testing of Fill Riser Containment Sumps <br />❑ N/A (No fill riser sumps) <br />❑ Fill Riser Containment Sumps are Present, but were Not Tested <br />Test Method Developed By: ❑ Sump Manufacturer; ❑ Industry Standard; ❑ PE; ❑ Other (Specie): <br />Test Method Used: ❑ Pressure; ❑ Vacuum; ❑ Hydrostatic; ❑ Other (Specie): <br />Test Equipment Used: Equipment Resolution: <br />Sump #: Sump #: Sump #: Sump #: <br />Dispenser # 2/4 <br />Dispenser # Sat 2/3 <br />Dispenser # 2 SATA <br />Manster <br />Dispenser # 1 SAT <br />Is UDC Exempt from Testing? <br />❑ Yes; ® No <br />❑ Yes; ® No <br />❑ Yes; ® No <br />❑ Yes; ® No <br />UDC Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />UDC Model: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />UDC Depth: <br />34" <br />34" <br />34" <br />34" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12" <br />12" <br />12" <br />12" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />20" <br />20" <br />20" <br />20' <br />Portion of UDC Tested` <br />Bottom Half <br />Bottom Half <br />Bottom Half <br />Bottom Half <br />If turbine shuts down when UDC <br />sensor detects liquid, specify <br />turbine shutdown response time. <br />® N/A <br />minutes. <br />® N/A <br />minutes. <br />® N/A <br />minutes. <br />® N/A <br />minutes. <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15 minutes. <br />15 minutes. <br />15 minutes. <br />15 minutes. <br />Test Start Date/Time: <br />9:46 <br />9:24 9:46 <br />1:17 <br />1:17 1:32 <br />Initial Reading (Rj): <br />3.655 <br />3.658 3.655 <br />1.595 <br />6.527 6.527 <br />Test End Date/Time: <br />10:01 <br />9:39 10:01 <br />1:32 <br />1:32 1:47 <br />Final Reading (RF): <br />3.508 <br />3.658 3.654 <br />0.508 <br />6.527 6.527 <br />Change in Reading (RF — Rj): <br />0.147 <br />0.00 0.001 <br />1.087 <br />0.00 0.00 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Test Result: <br />® Pass; ® Fail <br />® Pass; ❑ Fail <br />❑ Pass; ® Fail <br />® Pass; D Fail <br />Was leak detection sensor <br />properly replaced and verified as <br />functional after testing? <br />® Yes; ❑ No; <br />❑ N/A (Not Removed) <br />®Yes; [1 No; <br />❑ N/A (Not Removed) <br />El Yes; ❑ No; <br />❑ N/A (Not Removed) <br />E] Yes; F1 No; <br />ElN/A (Not Removed) <br />H. Testing of Fill Riser Containment Sumps <br />❑ N/A (No fill riser sumps) <br />❑ Fill Riser Containment Sumps are Present, but were Not Tested <br />Test Method Developed By: ❑ Sump Manufacturer; ❑ Industry Standard; ❑ PE; ❑ Other (Specie): <br />Test Method Used: ❑ Pressure; ❑ Vacuum; ❑ Hydrostatic; ❑ Other (Specie): <br />Test Equipment Used: Equipment Resolution: <br />Sump #: Sump #: Sump #: Sump #: <br />Sump Diameter (inches): <br />Sump Depth (inches): <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test (minutes): <br />Test Start Date/Time: <br />Initial Reading (Rj): <br />Test End Dat /Time: <br />Final Reading (RF): <br />Change in Reading (RF — Rt): <br />2. If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "N/A", the entire UDC must be tested. [See SWRCB Local Guidance Letter LG -160] <br />UN -054 - 4/5 www.unidoes.org 02/26/02 <br />