Laserfiche WebLink
05/06/2013 01:48PM 6616349233 KERN CONSTRUCTION PAGE 02/03 <br />SWRCB, January 2002 <br />4. SECONDARY PIPE TESTING <br />Page __Z of 3 <br />Test Method Developed By: ❑ Piping Manufacturer x Industry Standard ❑ Professional Engineer <br />0 Other (Specify) <br />Test Method Used: x Pressure ❑ Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used:4"dial gauge <br />M <br />Piping Material: <br />Piping Run # piping Run # <br />Satellite #1 <br />Plastic <br />Equipment Resolution:0-15 psi <br />Piping Run # Piping Run # <br />Piping Manufacturer: <br />OPW <br />Piping Diameter: <br />1.5" <br />Length of Piping Run: <br />20' <br />Product Stored: <br />DSL <br />Method and location of <br />i in -run isolation: <br />UDC 1 Satellite <br />Wait time between applying <br />pressure/vacuum/water and <br />startin test: <br />30 min. <br />Test Start Time: <br />9:30 <br />Initial Reading (R,): <br />5.2 PSI <br />Test End Time: <br />10:30 <br />Final Reading (RF): <br />5.2 PSI <br />Test Duration: <br />1 Hr. <br />Change in Reading (RF-Ri): <br />0.0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />0.0 PSI <br />Test Result: <br />❑ Pass ❑ Fail <br />0 Pass ❑ Fail <br />❑ Pass D Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />