My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 11:18:53 AM
Creation date
9/24/2018 11:22:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2012 - 2014
FileName_PostFix
2012 - 2014
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 .05/06/2013 01:48PM 6616349233 KERN CONSTRUCTION PAGE 03/03 <br />SWRCB, January 2002 <br />5. UNDER -DISPENSER CONTAINMENT (UDC) TF.STYNC. <br />Page -3 of d <br />Test Method Developed By: ❑ UDC Manufacturer x Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum x Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:Incon is-sts <br />Equipment Resolution:.001" <br />UDC #1/2 UDC #3/4 <br />UDC # UDC # <br />UDC Manufacturer: Environ <br />UDC Material: <br />Poly <br />UDC Depth: <br />34" <br />Height from UDC Bottom to Top <br />20" <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />0" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />good <br />testing: <br />Portion of UDC Tested <br />1/2 <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />I x Yes 0 No ❑ NA <br />❑ Yes ❑ No 0 <br />[]Yes ❑ No ❑ NA <br />11 Yes 0 No ❑ <br />-product and water)?' <br />NA <br />NA <br />Turbine shutdown response time <br />3 sec <br />Is system programmed for fail- <br />safe shutdown?* <br />x Yes [I No 0 NA <br />[]Yes ❑ No ❑ <br />❑ Yes 0 No ❑ <br />0 Yes ❑ No ❑ <br />NA <br />NA <br />NA <br />Was fail-safe verified to be <br />operational?* <br />x Yes El No ❑ NA <br />❑ Yes ❑ No El❑ <br />[]Yes ❑ No ❑ NA <br />Yes ❑ No ❑ <br />NA <br />NA <br />Wait time between applying <br />15 min. <br />pressure/vacuum/water and <br />s—tarting test <br />Test Start Time: <br />9:13 <br />Initial Reading W: <br />1.379 <br />Test End Time: <br />9:28 <br />Final Reading F): <br />1.379 <br />Test Duration: <br />15 Min <br />Chan a in Readin RF -RI : <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />Test Result: <br />X Pass 0 Fail <br />❑ Pass ❑ Fail <br />❑ Pass 0 Fair <br />0 Pass ❑ Fair <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ <br />❑ Yes ❑ No ❑ NA <br />0 Yes ❑ No DNA <br />❑ Yes ❑ No ❑ NA <br />NA <br />Was sensor properly replaced and <br />X Yes ❑ No ❑ <br />verified functional after testing? <br />NA <br />❑ Yes ❑ No ❑ NA <br />0 Yes 0 No ❑ NA <br />❑Yes ❑ No ❑ NA <br />Comments— (include information on repairs made prior to testing, and recommended ollow-up for ailed tests) <br />! If the entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.