Laserfiche WebLink
Table G-10 General Rule Requirements for Onshore Facilities <br />N!A`' <br />E,lch,container is provided with a system or documented procedure to prevent overfills for the container. <br />El <br />11 <br />Describe: <br />Convault Tanks- Filled by professional transfer companies <br />(presently ER Vine). System utilizes vapor lock shut down <br />when tanks are full. <br />Waste Oil Barrels- Transfer is performed by specifically <br />trained employees. Transfer utilizes a maximum of 5 gallons <br />transferred at one time. Employee performing transfer visuall <br />inspects fill level after each 5 gallon transfer. <br />Liquid level sensing devices are regularly tested to ensure proper operation [See Inspection Log and <br />Schedule in Attachment 3.1]. (§112.6(a)(3)(iii)J <br />Visible discharges which result in a loss of oil from the container, including but not limited to seams, <br />*. <br />El <br />gaskets, piping, pumps, valves, rivets, and bolts are promptly corrected and oil in diked areas is promptly <br />removed. [§§ 112.8(c)(10) and 112.12(c)(10)] <br />Aboveground valves, piping, and appurtenances such as flange joints, expansion joints, valve glands and <br />bodies, catch pans, pipeline supports, locking of valves, and metal surfaces are inspected regularly. [See <br />Inspection Log and Schedule in Attachment 3.1] [§§l 12.8(d)(4) and 112.12(d)(4)J <br />Integrity and leak testing are conducted on buried piping at the time of installation, modification, <br />construction, relocation, or replacement. [See Inspection Log and Schedule in Attachment 3.1] <br />(§§112.8(d)(4) and 112.12(d)(4)J <br />Facility Name Page 10 Tier I Qualified Facility SPCC Plan <br />Tu oy a es c. <br />