Laserfiche WebLink
Ver. 1-I. pdi-3-1$-til <br />[A. Onshore Facilities (excluding production) (§§112.8(b) through (d), 112.12(b) through (d)): <br />The owner or operator must meet the general rule requirements as well as requirements under this section. Note that not at! provisions <br />may be applicable to all owners/operators. For example, a facility may not maintain completely buried metallic storage tanks installed <br />after January 10, 1974, and thus would not have to abide by requirements in §§112.8(c)(4) and 112.12(c)(4), listed below. In cases <br />where a provision is not applicable, write "N/A". <br />Table _G-10.General Rule Requirements for Onshore Facilities <br />N/A <br />Drainage from diked storage areas is restrained by valves to prevent a discharge into the drainage <br />system or facility effluent treatment system, except where facility systems are designed to control such <br />discharge. Diked areas may be emptied by pumps or ejectors that must be manually activated after <br />inspecting the condition of the accumulation to ensure no oil will be discharged. (§§112.8(b)(1) and <br />112.12(b) (1 <br />Valves of manual, open -and -closed design are used for the drainage of diked areas. (§§112.8(b)(2) and <br />112.12 b 2 <br />The containers at the facility are compatible with materials stored and conditions of storage such as <br />pressure and temperature. 1128(c)(1) and 112.12(c)(1 <br />Secondary containment for the bulk storage containers (including mobile/portable oil storage containers) <br />holds the capacity of the largest container plus additional capacity to contain precipitation. Mobile or <br />portable oil storage containers are positioned to prevent a discharge as described in §112.1(b). <br />112.6 a 3) fi <br />If uncontaminated rainwater from diked areas drains into a storm drain or open watercourse the following <br />procedures will be implemented at the facility: [§§l 12.8(c)(3) and 112.12(c)(3)] <br />• Bypass valve is normally sealed closed <br />• Retained rainwater is inspected to ensure that its presence will not cause a discharge to <br />El <br />Pd <br />navigable waters or adjoining shorelines <br />• Bypass valve is opened and resealed under responsible supervision <br />❑ <br />W <br />• Adequate records of drainage are kept [See Dike Drainage Log in Attachment 3.3] <br />El <br />For completely buried metallic tanks installed on or after January 10, 1974 at this facility (§§112.8(c)(4) <br />and 112.12(c)(4)]: <br />• Tanks have corrosion protection with coatings or cathodic protection compatible with local soil <br />❑ <br />conditions. <br />• Regular leak testing is conducted. <br />For partially buried or bunkered metallic tanks j§112.8(c)(5) and §112.12(c)(5)]: <br />• Tanks have corrosion protection with coatings or cathodic protection compatible with local soil <br />❑ <br />®. <br />conditions. <br />Each aboveground bulk container is tested or inspected for integrity on a regular schedule and whenever <br />DE <br />El <br />material repairs are made. Scope and frequency of the inspections and inspector qualifications are in <br />accordance with industry standards. Container supports and foundations are regularly inspected. <br />[See Inspection Log and Schedule and Bulk Storage Container Inspection Schedule in <br />Attachments 3.1 and 3.21 [§112.8(c)(6) and 112.12 c 6 i <br />Outsides of bulk storage containers are frequently inspected for signs of deterioration, discharges, or <br />e <br />El <br />accumulation of oil inside diked areas. [See Inspection Log and Schedule in Attachment 3.1] <br />112.8c 6 and 112.12c 6 <br />For bulk storage containers that are subject to 21 CFR part 110 which are shop -fabricated, constructed of <br />austenitic stainless steel, elevated and have no external insulation, formal visual inspection is conducted <br />on a regular schedule. Appropriate qualifications for personnel performing tests and inspections are <br />documented. [See Inspection Log and Schedule and Bulk Storage Container Inspection Schedule <br />in Attachments 3.1 and 3.2] [§ 112.12 c 6 ii <br />Facility Name: �. <br />tier; Qualified aniirj S'Ci;_Tll .f__.B.oyInc ': +' <br />