My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
3870
>
2800 - Aboveground Petroleum Storage Program
>
PR0535773
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 1:08:10 PM
Creation date
9/24/2018 4:57:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0535773
PE
2831
FACILITY_ID
FA0009612
FACILITY_NAME
TUFF BOY SALES INC
STREET_NUMBER
3870
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
24140005
CURRENT_STATUS
01
SITE_LOCATION
3870 W YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i also understand my other obligations relating to the storage of oil at this Facility, including, among others: <br />1. To report any oil discharge to navigable waters or adjoining shorelines to the appropriate authorities. Notification <br />information is included in this Plan. <br />2. To review and amend this Plan whenever there is a material change at the facility that affects the potential for an <br />oil discharge, and at least once every five years. Reviews and amendments are recorded in an attached log [See <br />Five Year Review Log and Technical Amendment Log in Attachments 1.1 and 1.2.] <br />3. Optional use of a contingency plan. A contingency plan: <br />a. May be used in lieu of secondary containment for qualified oil -filled operational equipment, in accordance <br />with the requirements under §112.7(k), and; <br />b. Must be prepared for flowlines and/or intra -facility gathering lines which do not have secondary <br />containment at an oil production facility, and; <br />c. Must include an established and documented inspection or monitoring program; must follow the provisions <br />of 40 CFR part 109; and must include a written commitment of manpower, equipment and materials to <br />expeditiously remove any quantity of oil discharged that may be harmful. If applicable, a copy of the <br />contingency plan and any additional documentation will be attached to this Plan as Attachment 2. <br />1 certify that I have satisfied the requirement to prepare and implement a Plan under §112.3 and all of the requirements <br />under §112.6(a). I certify that the informati n contained in this Plan is true. <br />Signature ` Title: Safety nnar_,-;lr-- <br />Name Bryce rkins Date: / /20 <br />II. Record of Plan Review and Amendments <br />Five Year Review (§112.5(b)): <br />Complete a review and evaluation of this SPCC Plan at least once every five years. As a result of the review, amend this Plan <br />within six months to include more effective prevention and control measures for the facility, if applicable. Implement any SPCC Plan <br />amendment as soon as possible, but no later than six months following Plan amendment. Document completion of the review and <br />evaluation, and complete the Five Year Review Log in Attachment 1.1. If the facility no longer meets Tier I qualified facility eligibility, the <br />owner or operator must revise the Plan to meet Tier II qualified facility requirements, or complete a full PE certified Plan. <br />Table G 1,Technical Amendments, (§§1112.5(a), (c and:112:6(a)(2)) <br />This SPCC Plan will be amended when there is a change in the facility design, construction, operation, or <br />NF <br />maintenance that materially affects the potential for a discharge to navigable waters or adjoining shorelines. <br />Examples include adding or removing containers, reconstruction, replacement, or installation of piping <br />systems, changes to secondary containment systems, changes in product stored at this facility, or revisions to <br />standard operating rocedures. <br />Any technical amendments to this Plan will be re -certified in accordance with Section I of this Plan template. <br />[§1 12.6(a)(2)] [See Technical Amendment Log in Attachment 1.21 <br />Facility Name: Tt� f f v 5�_ Inc. Page 2 Tier I Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.