Laserfiche WebLink
Ver. 1-E-doc-3-18-10 <br />7. NRC Notification Procedure (§112.7(a)(4) and (a)(5)): <br />' Table G-9 NRC Notification Procedure <br />In the event of a discharge of oil to navigable waters or adjoining shorelines, the following information identified <br />in Attachment 4 will be provided to the National Response Center immediately following identification of a <br />discharge to navigable waters or adjoining shorelines [See Discharge Notification Form in Attachment 41: <br />N 112.7(a) (4) ) <br />The exact address or location and phone 0 Description of all affected media; <br />number of the facility; 0 Cause of the discharge; <br />• Date and time of the discharge; • Any damages or injuries caused by the discharge; <br />• Type of material discharged; . Actions being used to stop, remove, and mitigate the <br />• Estimate of the total quantity discharged; effects of the discharge; <br />• Estimate of the quantity discharged to navigable 0 Whether an evacuation may be needed; and <br />waters; • Names of individuals and/or organizations who have <br />• Source of the discharge; also been contacted. <br />8. SPCC Spill Reporting Requirements (Report within 60 days) (§112.4): <br />Submit information to the EPA Regional Administrator (RA) and the appropriate agency or agencies in charge of oil <br />pollution control activities in the State in which the facility is located within 60 days from one of the following discharge <br />events: <br />A single discharge of more than 1,000 U.S. gallons of oil to navigable waters or adjoining shorelines or <br />Two discharges to navigable waters or adjoining shorelines each more than 42 U.S. gallons of oil occurring within <br />any twelve month period <br />You must submit the following information to the RA: <br />(1) Name of the facility; <br />(2) Your name; <br />(3) Location of the facility; <br />(4) Maximum storage or handling capacity of the facility and normal daily throughput; <br />(5) Corrective action and countermeasures you have taken, including a description of <br />equipment repairs and replacements; <br />(6) An adequate description of the facility, including maps, flow diagrams, and topographical <br />maps, as necessary; <br />(7) The cause of the reportable discharge, including a failure analysis of the system or <br />subsystem in which the failure occurred; and <br />(8) Additional preventive measures you have taken or contemplated to minimize the <br />possibility of recurrence <br />(9) Such other information as the Regional Administrator may reasonably require pertinent <br />to the Plan or discharge <br />NOTE: Complete one of the following sections (A, B or C) <br />as appropriate for the facility type. <br />Facility Name. Tuff Boy Sales , Inc . Page 8 Tier I Qualified Facility SPCC Plan <br />