Laserfiche WebLink
HAZARDOUS WASTE CONTINGENCY PLAN <br /> The requirements for a hazardous waste contingency plan, as outlined in Title <br /> 22 of the California Code of Regulations, Section 66265.52 and 40 CFR <br /> 265.52 indicate that "if the owner or operator has already prepared a SPCC <br /> Plan in accordance with 40 CFR 112, or some other emergency or <br /> contingency plan, he need only amend that plan to incorporate hazardous <br /> waste management provisions". As demonstrated in the table below, the <br /> terminal's existing SPCC plan contains the items required for the hazardous <br /> waste contingency plan. The table outlines the required content of a <br /> contingency plan and the location within the SPCC plan or other facility <br /> emergency plan where the item is addressed. These Plans have been <br /> prepared to respond to a worst-case discharge of oil and can be readily <br /> applied to a release of hazardous waste from the wastewater treatment <br /> system or from hazardous waste that may be periodically generated <br /> elsewhere at the facility. Copies of the plans are maintained in the Terminal <br /> Technician's office or with other major HSSE documents/records. <br /> Hazardous Waste Location in Equivalent Emergen <br /> Contingency Plan Plan cy <br /> Regulatory Citation <br /> Requirement <br /> Procedures to respond Releases:SPCC Plan (Immediate 22 CCR 66265.52(a) <br /> to fires, explosions, Response Measures(red tab)and pg. 40 CFR 265.52(a) <br /> releases 13-1 to 13-4); Fire and Explosions: <br /> Emergency Preparedness Plan and <br /> General Disaster Plan <br /> Arrangements with local SPCC Plan(Immediate Response 22 CCR 66265.52(c) <br /> Police, Fire, Hospitals Measures-Emergency Call List(red 40 CFR 265.52(c) <br /> tab)and Attachment 11 <br /> Arrangements with SPCC Plan(Immediate Response 22 CCR 66265.52(c) <br /> contractors Measures—Emergency Call List(red 40 CFR 265.52(c) <br /> tab)and Attachment 3); OPA'90 Plan <br /> (Facility Response Plan/FRP <br /> Primary emergency SPCC Plan(Immediate Response 22 CCR 66265.52(d) <br /> coordinator and Measures—Emergency Call List(red 40 CFR 265.52(d) <br /> alternate name, phone tab <br /> List of emergency SPCC Plan(pg 13-7 to 13-9); OPA'90 22 CCR 66265.52(e) <br /> equipment Plan FRP -Section 1.1.4 40 CFR 265.52(e) <br /> Location and description SPCC Plan(pg 13-7 to 13-9) 22 CCR 66265.52(e) <br /> of the emergency 40 CFR 265.52(e) <br /> equipment capabilities <br /> Evacuation Plan, SPCC Plan(pg 13-6 and 13-7); 22 CCR 66265.52(f) <br /> including primary and Emergency Preparedness Plan 40 CFR 265.52(f) <br /> alternate routes and <br /> communication signals <br />