Laserfiche WebLink
,January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />.cility is Not Equipped With Snill/Overfill Containment Rnxes n <br />Page 3 of <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer >iudustry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: rco —s r5 Equipment Resolution: <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />4 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />47"91 <br />Initial Reading (RI): <br />j_1-1, <br />1--115 <br />Test End Time: <br />9' ss <br />10!.12 <br />Final Reading (RF): <br />1.-7 *� <br />1.11 <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />9'Pass ❑ Fail <br />❑ Pass ❑ Fail <br />j ❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />