Laserfiche WebLink
.B, January 2002 <br />6. PIPING SUMP TESTING <br />Page � of b <br />lest Metttoa Developed By: ❑ Sump Manufacturer ustry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ArHydrostatic <br />❑ Other (Spec6) <br />Test Equipment Used: N r Orl -7 S ` 5T5 <br />Equipment Resolution: <br />Sump # % Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />Z j' <br />Sump Depth: <br />k <br />Sump Material: <br />111 <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />j <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />f 1 <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />�ivvn <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />/Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?* <br />/4;� Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />-Yes ❑ No ❑ NA <br />❑ Yes []No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />..� <br />Initial Reading (Rj): <br />•40 h <br />b AM <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />`Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing'? <br />Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />