My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 -2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_1998 -2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 9:38:21 AM
Creation date
9/28/2018 11:22:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_1998 -2011
FileName_PostFix
1998 -2011
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 2 of 7 <br />4. TANK ANNULAR TESTING <br />Test Method Developed By: U Tank Manufacturer XI Industry Standard U Professional Engineer <br />U Other (Spec) <br />Test Method Used: U Pressure XJ Vacuum U Hydrostatic <br />U Other (Specify) <br />Test Equipment Used: Vacuum generator — <br />Tank # 1 <br />gages <br />Equipment Resolution: <br />Tank # <br />Tank # <br />Tank # <br />Is Tank Exempt From Testing?'f20, <br />X No <br />11 Yes l_I No <br />I I Yes U No <br />Ll Yes U No <br />Tank Capacity: <br />Tank Material: <br />Clad S <br />eel <br />Tank Manufacturer: <br />Welding <br />Product Stored: <br />Diesel <br />' <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />hr. <br />Test Start Time: <br />9*30 <br />Initial Reading (111): <br />7" HG <br />Test End Time: <br />10 : 3 0 <br />Final Reading (RF): <br />7" HG <br />Test Duration: <br />1 hr. <br />Change in Reading (RF-Rj): <br />0 <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />XI Pass U Fall <br />U Pass U Fail <br />U Pass u Fail <br />U Pass U Fall <br />Was sensor removed for testing? <br />IX Yes IJ No U AIA <br />U Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />lXYes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />Comments — (inclufle information on repairs made pij r to testing, and recommendedJulloiv-upJorpiled tests) <br />' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.