Laserfiche WebLink
SWRCB, January 2002 Page 3 of 7 <br />5_ RRVONDARY PIPE. TESTING <br />Test Method Developed By: U Piping Manufacturer IXIndustry Standard U Professional Engineer <br />U Other (Sped) <br />Test Method Used: X Pressure U Vacuwn U Hydrostatic <br />U Other (Spec) <br />Test Equipment Used: Pressure qaqes <br />Piping Run # 1 Piping Run # 2 <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Material: <br />p <br />Piping Manufacturer: <br />--Plasti.c <br />Environ Environ <br />A111 1 alvi <br />Piping Diameter: <br />_ <br />Length of Piping Run: <br />80' 80' <br />Product Stored: <br />Diesel Diesel <br />Method and location of <br />piping -run isolation: <br />Inside pipe sump to <br />inside disp. pan SAME <br />Wait time between applying <br />pressure/vacuum/water and <br />startingtest: <br />2 hr , z h r . <br />Test Start Time: <br />9:00 9: 3 0 <br />Initial Reading (R,): <br />4. 5 P S I 4. 5 P S I <br />Test End Time: <br />10:00 1 0. 3 0 <br />Final Reading (RF): <br />4. 5 P S I 4. 5 P S I <br />Test Duration: <br />Change in Reading (RF-Rj): <br />0 0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 Loss 0 Loss <br />Test Result: <br />X Pass U Fail IX Pass U Fail <br />U Pass U Fail <br />U Pass U Fail <br />Comments — (include information on repairs made priorro testing, and recommended follow-up forfailed tests) <br />