My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 -2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_1998 -2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 9:38:21 AM
Creation date
9/28/2018 11:22:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_1998 -2011
FileName_PostFix
1998 -2011
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM OIL EQUIPMENT PHONE NO. : 209 7545726 Jan. 16 2003 04:51AM P6 <br />SWRCB, January 2002 Page 5 of 8 <br />If the testing method docs not test the entire depth of the sump, specify how much of the sump was tested. Methods not testing the <br />entire sump should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWR.CB Lk; -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should also be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time_ This should be done if the secondary <br />containment testing method used does not test the entire volume of the sump. <br />This information is not needed if the entire sump is tested. <br />6. PIPING SUMP TESTING: <br />By: <br />l l Sump Manufacturer <br />1.1 Industry Standard U Professional Engineer <br />U Other (SpecJ}�)ed: <br />EIMAvelopcd <br />0 Pressure <br />0 Vacuum <br />Q Hydrostatic <br />0 Other(Specify) <br />Test Equipment Used. <br />Equipment Resolution: <br />Sump # <br />SUMP # <br />Sump # Sump # <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />Ni hest Pi in Pcnetratian: <br />w,�,.,_, <br />Height from Tank Top to Lowest <br />, <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects either product <br />U Yes U No U NA <br />U Yes a No 11 NA <br />U Yes u No U NA U Yes <br />UNo UNA <br />or water?' <br />Turbine shutdown response time' <br />Is system programmed for fail-safe <br />U Yes UNo UNA <br />U Yes U No UNA <br />u Yes UNo UNA U Yes <br />UNo UNA <br />shutdown?' <br />Was fail-safcverified to be <br />IIYes UNo UNA <br />UY&s UNo UNA <br />LIYes UNo UNA Utes <br />UNo UNA <br />operational?' _ <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test. <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Pleading (R,:): <br />Test Duration: <br />Change in Reading (%.-Ri)- <br />Pass/ -ail Threshold or Cr'iter'a: <br />Test Result. <br />U Pass U Fall <br />U Pass U Fall <br />U Pass U Fall U Pass U Fall <br />Was sensor removed for testing <br />U Yes Li No U NA'? <br />U Yes a No UNA <br />u Yrs UNo UNA t_I Yes <br />UNo UNA <br />Was sensor properly replaced and <br />u Yes UNo UNA <br />U Yes LI No UNA <br />U Yes 1.1 Na UNA U Yc s <br />UNo UNA <br />verified functional after testing? <br />Coinments — Cinclude informati�lR on repairs made prior to testin ,and recommended odlow a or ailed tests <br />If the testing method docs not test the entire depth of the sump, specify how much of the sump was tested. Methods not testing the <br />entire sump should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWR.CB Lk; -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should also be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time_ This should be done if the secondary <br />containment testing method used does not test the entire volume of the sump. <br />This information is not needed if the entire sump is tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.