Laserfiche WebLink
FROM : OIL EQUIPMENT <br />PHONE NO. : 209 7545726 <br />SW kCB, January 2002 <br />- --- 7. UNDrR-DISPENSER CONTAINMENT UDC ' <br />IE <br />Test Method sevcloped By: U UDC Manufacturer U Industry Standard <br />U Other (SpecO) <br />Test Method Used: U Pressure U Vacuum <br />U Other (Speedy) <br />Test Equipment Used: <br /># UDC # I UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from 1JDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Jan. 16 2003 04:51AM P7 <br />Page 6 of $. <br />1G <br />U Professional Engineer <br />U Hydrostatic <br />Resolution: <br />UDC # <br />Does turbine shut down when <br />UDC sensor detects either <br />product or watce?* <br />Turbine shutdown res nse time <br />is system programmed for fail- <br />safe shutdown`? <br />Was fail-safe verified to be <br />operational?' <br />Wait time between applying <br />U Yes <br />U Yes <br />U Ycs <br />UNo <br />L_I No <br />IJ No <br />U NA <br />U NA <br />U NA <br />U Yes <br />U Yrq <br />LJYes <br />UNo <br />UNo <br />Lwo <br />1.11VA <br />U NA <br />U NA <br />U Yes <br />u Y es • <br />UYcs <br />UNo <br />1.1 No <br />UNo <br />U NA <br />U NA <br />U NA <br />IJ Yes <br />U Yes <br />U Yes <br />UNo <br />U No <br />UNo <br />U NA <br />U NA <br />U NA <br />pressure/vacuttm/water and <br />starting test <br />Test Start Time: <br />Initial Reading (R,)! <br />Test End Time: <br />Final Reading (P-0: <br />Test Duration: <br />ChanLe in Readin � <br />Pass/Pail Threshold orCriterla: <br />Test Result' <br />U Pass U F211 <br />U Pass 1.1 Fail <br />U Pass U Fail <br />U Pass U Fall <br />Was sensor removed for testin&? <br />LI Y'es <br />UNo <br />U NA <br />U Yes <br />U No <br />I: I NA <br />U Yes <br />UNo <br />U NA <br />U Yes <br />U No <br />U NA <br />Was sensor properly replaced and <br />i7 Yes <br />❑ No <br />U NA <br />Ll Yes <br />U No <br />U NA <br />U Yes <br />UNo <br />U NA <br />U Yes <br />U No <br />U NA <br />verified functional after testing'? <br />_ <br />Comments — (include information on repairs made prior to tecr/n and recommended %llury t for _failed ,,d tests) <br />If the testing method does not test the entire depth of the UDC, specify how much of the UDC was tested_ Methods not testing the <br />entire UDC should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LG -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should also be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment testing method used does not test the entire volume of the UDC <br />This information is not needed if the entire UDC is tested. <br />