Laserfiche WebLink
From : Angelica Sandoval Marin [EH] Imailto :amarinCalsjcehd.com] <br /> Sent: Thursday, February 05, 2015 2 : 59 PM <br /> To: Daniel Villanueva <br /> Subject: RE: Corrected Work Plan for Apache Plastics <br /> Daniel, <br /> I have reviewed the Waste Discharge Permit Application-Addendum & Well Installation Work Plan <br /> Correction Letter and found the following errors: <br /> Scope of Work, page 2: three (2) shallow-screened groundwater monitoring wells. <br /> Figure 2: Proposed shallow monitoring well #22 not labeled on site map. <br /> Also, the permits that you submitted need to be corrected . The deep monitoring/injection well <br /> permit has MW-21, MW-22, 1W-4 and IW-5. The MW-22 is a shallow well and should be added onto <br /> the shallow permit with MW-23 and MW-24 <br /> Please fix the errors on both the 4work plan and permits and resubmit. <br /> Thanks <br /> Angelica <br /> Angelica Sandoval Marin, Senior REHS <br /> San Joaquin County, Environmental Health Department <br /> 1868 E . Hazelton, CA 95205 <br /> (209) 468-2807 desk <br /> (209) 468-0341 fax <br /> Email : amarin@sicehd .com <br /> Angelica, <br /> Please see Jims Email below. Once the wells are installed a revised MRP and figures that are required for <br /> the MRP will be placed in the well installation report. <br /> Please advise if we can move forward with the installations. <br /> Regards, <br /> Daniel Villanueva <br /> Project Geologist <br /> Advanced GeoEnvironmental , Inc. <br /> Environmental • Industrial Hygiene • Geotechnical • Contracting <br /> Phone : 800-511 -9300 <br />