Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: K Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No* Was accuracy of system product level readings tested? <br /> Yes No* Was accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> x Yes -; No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Check all <br /> N/A that apply) Simulated leak rate:03 g.p.h.;❑0.1 g.p.h; 00.2 g.p.h. <br /> x Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes No* Was the testing apparatus properly calibrated? <br /> x Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> x N/A <br /> I Yes i No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> x N/A disconnected? <br /> Yes No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> x N/A fails a test? <br /> Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> x N/A <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page of 12/07 <br />