Laserfiche WebLink
RECENED <br /> [',.U:, G 2 7.013 <br /> D. Results of Testing/Servicing ENVIRONMENTAL <br /> HEALTH DEPARTMENT <br /> Software Version Installed: <br /> Complete the following checklist: <br /> x Yes No' Is the audible alarm operational? <br /> x Yes No' Is the visual alarm operational? <br /> x Yes U No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> x Yes C No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> P,. <br /> er o ration? <br /> x Yes - No. If alarms are relayed to a remote monitoring station.is all communications equipment(e.g.modem)operational? <br /> N/A <br /> x Yes D No' For pressurized piping systems, does the turbine automatically shut down 9 the piping secondary containment monitoring system <br /> U WA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> EISump/Trench Sensors; ElDispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failureldisconnection? ElYes; E]No. <br /> Yes No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> WA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm trigger? % <br /> Yes' x_ No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> Yes' K No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)OProduct; ❑Water. V <br /> es,describe causes in Section E,below. <br /> x Yes No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> x Yes No' I Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> SYSTEM COLD START WAS PERFORMED DUE TO H8 COMMS ALARM,ALL(37)SENSORS WERE TESTED FOR PROPER OPERATION. <br /> *212 TRANSITION SUMP *137 TRANSITION SUMP 97 <br /> Monitoring System Certification Page of 12107 <br />