Laserfiche WebLink
RECEIVED <br /> AU6 G 2 2613 <br /> F. In-Tank Gauging/SIR Equipment: = Check this box if tank gauging is used only for inventory control. ^,l N •'E TAT <br /> Check this box if no tank gauging or SIR equipment is installed, H DEPARTMENT <br /> This section must be completed it in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com fete the followingchecklist: <br /> G Yes No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> D Yes x No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> D Yes : No" Was accuracy of system product level readings tested? <br /> D Yes . No' Was accuracy of system water level readings tested? <br /> C Yes x No' Were all probes reinstalled properly? <br /> Yesx No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> `In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑Check this box if LLDs are not installed. <br /> Com tete the followin checklist: <br /> Yes INo' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> x WA that apply) Simulated leak rate:E]3 g.p.h.;[–]0.1 g.p.h;[]0.2 g.p.h. <br /> L Yes –7;—No- Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> D Yes 'x No' Was the testing apparatus properly calibrated? <br /> D Yes x No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> g N/A <br /> D YesNo' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> 1-1 Yes L No' For electronic LLDs, does the turbine automatically shut off it any portion of the monitoring system is disabled or <br /> X WA disconnected? <br /> 0 Yes No' For electronic LLDs,does the turbine automatically shut off it any portion of the monitoring system malfunctions or <br /> .x NA fails a test? <br /> -[�Yes No` For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> X N/A <br /> Yes x No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> ALL SENORS CONNECTED TO THIS VEEDER ROOT WERE TESTED FOR OPERATION,NO OTHER TEST ON EQUIPMENT WAS PERFORMED. <br /> Monitoring System Certification Page of 12/07 <br />