Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209)468-3433 Web:www.sigov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> FLYING J TRAVEL PLAZA 1617 1 15237 N THORNTON RD LODI May 21 2015 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 723 CFR 112.8(d)(1) Failed to provide corrosion protection for buried piping ❑V o R ❑COS <br /> 724 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves, piping, and appurtenances ❑V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary. <br /> The October 2014 SPCC Plan on page 3-5 of section 3.1.3 mentions a 20,000 gallon bio diesel AST but this AST is <br /> not mentioned in table 2-3 on page 2-7. This bio diesel AST has a sign indicating that it is a B99 Bio diesel. The plan <br /> has not been completely amended to accurately include the bio diesel AST in table 2-3 on page 2-7. The Spill <br /> Prevention, Control, and Countermeasure(SPCC) Plan must be amended when there is a change in the facility <br /> design, construction, operation, or maintenance that materially affects its potential for a discharge, within 6 months of <br /> the change, and implemented as soon as possible, not later than 6 months following preparation of the amendment. <br /> Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and policies <br /> currently in place at the facility. <br /> This is a minor violation. <br /> Received by Inspector: Phone: Date: <br /> (initial): ARIS VELOSO, Senior REHS (209)468-3453 05/21/2015 <br /> Page 3 of 5 <br />