My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/06/2004 17:28 40894201?1 BALCH PAGE 05 <br /> V#AW 1411110 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> M0,. <br /> TYPE OF ACTION R1NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> MM. <br /> PLAN TYpE C) MONITORING IS IDENTICAL FOR ALL USTs AT THIS PACILIn, <br /> (Cbeck one item oNY) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($): <br /> 1. FACILITY INFORMATION <br /> FACILITY ID it(,fyancy Use Oey) I 1 1 - 1 _ <br /> FACILITY NAME �n VJ O., - 1.�" V 0"WA-�Y <br /> FACILITY STIE ADDRESS M01' CITY Ma. <br /> Lf loo <br /> C V �Y•C4 <br /> I1. EQUIPMENT TESTING AND PREVENTIVE MAINTENAN E <br /> Sam lave requires that mstma,Immcndve M*utwoancc,end calibration of monitoring cquipmom(e.g.,seoson,probes,line leak detectors,cu.)be perfomkd in Moa. <br /> eeeordeUea with the equlpmmt manufacarrera'instructions,or annuallywhichcvcr IS more frequent. Such work must be performed by qualified persomel. <br /> Mm, <br /> MONITORING EQWMENT IS SERVICED ®'1.ANNUALLY [I 99. <br /> OTHER(Spocify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan mus include a Site Plan showing the f you al tank and piping layouts and tort locations whm'c monitoring is roma Mo S SYS n of ach moor, <br /> line Imk deaetu,monitoring syaum conwl panel,etc.). If you already have a diagram lag.,current UST Monitoring Sitz Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan Me,etc. which shaves all 0051052 information include"with this Dim, <br /> IV. TANK MONITORING <br /> M0141TORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all That apply) M10. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNU'JAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULTS) <br /> SECONDARY CONTAINMENT IS: 63'9.DRY GM LIQUID FILLED ❑ c.UNDER PRESSURE. ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: _WCC ' A7 J1, Mle MODELN; <br /> LEAK SENSOR MANUFACTURER: VeTZZLILr \CS]�l`7 M14. MODEL a(S): I <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINOLb WALL iANKlS1 <br /> PANEL MANUFACTURER: M"' MODEL#: MIT. <br /> IN•TANK PROBE MANUFACTURER: MlaMODEL 6(S): Mw. <br /> LEAK TEST FREQUENCY: ❑ a,CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY Mm. <br /> ❑ d.MONTHLY ❑ e.OTHER(Spceiry): MIA' <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): Mzz. Mas. <br /> ❑ 3,INVENTORY RECONCILIATION Q a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mpr' <br /> ❑ A.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR 42645 <br /> TESTING PERIOD: ❑ a.36 HOURS [] b.60 HOURS M]3' <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR 42643.1 <br /> TEST FREQUENCY ❑ e.ANNUALLY ❑ b.BIENNIALLY ❑ a OTHER(Specify): Mz0' 'A0t' <br /> C3 (.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(xm.,.%gm yw, ) <br /> ❑ 99.OTHER(Specify): Mzs. <br /> V. PIPE MONITORING <br /> MO <br /> ,NTORING IS PERFORMED USING THE FOLLOWING METHOD($)(Check all that apply) M,W. <br /> W1.CONTINUOUS ELECTRONIC MONITORING 3)F PIPING SUMP(S)/IRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: LT a.DRY 0 b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER <br /> ERVACUUM M31' <br /> PANEL MANUFACTURER: UCPUaJ'�A.O�-k _ _ M9$' MODEL N: TL .S <br /> �."5E]-D Mz' <br /> LEAK SENSOR MANUFACTURER: V'e e, M34' MODEL a(S): 1 q 4 3 Mss. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.c.,TURBINE)SHUTDOWN? Ea ..YES ❑ b.NO M3°' <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? &?"..YES 0 b.NO <br /> 0/2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED u/(� ¢ /� <br /> MLLD MANUFACTURF.R(s): V„ `I Mn MODEL#(S): (C �-I� z��D�✓ Msy' <br /> E 3.ELECTRONIC LINE LEAK DETECTOR(FLLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS <br /> ELLD MANUPACTURER: Mao. MODEL q: Mal. <br /> PROGRAMMED LINE INTEGRITY TESTS' ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. Ma' <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? 0 e.YES 0 b.NO Maa. <br /> WILL ELLD FAMURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mat' <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: 0 s.ANNUALLY ❑ b.EVERY 3 YEARS ❑ a.OTHER(Specify) Mae Mo. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY- ❑ C.MIN.MONTHLY 6 EACH TIME SYSTEM OPERATED" Map. <br /> •pyM>.pey gpmvJ ••Nlwmafo rooularina•ru•lwm°emtt9aey genrnrw Ntl pipinaonlr oa MSC 9I5Ia I.Xa%1) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) MW <br /> SJCEHD-d(67/63)-V4 07!23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.