My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/06/2004 17:28 4089420111. BALCH PAGE 06 <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-PAGE 2 <br /> VI.DISPENSER MONITORING <br /> MOfJrfORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M'6' <br /> FS 1 CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) _ <br /> PANEL MANUFACTURER: & M M5. MODEL#: M57 <br /> LEAK SENSOR MANUFACTUV� VePdLL) c-d M!nODEL#(S):�7 . <br /> 'ICi <br /> L{ M5a' <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? 0 S�r e.YES ❑ b,NO Mss' <br /> WILL A UAC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? Ve.YES ❑ IS,NO MS'' <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER Mss' MODEL#(S): 1S9' <br /> ❑ ?.VISUAL MONITORING DONE: ❑ a.DAILY ❑ IS.WEEKLY fit".i.a y 1) Mea. <br /> ❑ 4.NO DISPENSERS <br /> ( pm M. <br /> ❑ S9.OTHER S tfy) M <br /> VII. ENHANCED LEAK DETECTION <br /> i.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN,PER 23 CCR¢2646.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFEVNCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Man. <br /> 1. B THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. U7' OPERATING MANUALS FOR ELECTRONIC MONITORING F.QUIPMpNT(Required) <br /> 3, ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 7/12004) <br /> 4. 0 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> S. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7, ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): <br /> MAI. <br /> Personnel with UST monitoring responsibilities aft familiar with all of the above documents relevant to theirjob duties and can access those documents when needed. <br /> By July 1,20G4,this facility will have a"Designated UST Operator"who bas passed the operator exam administered by the International Code Council(ICC'). By July <br /> 1,3004,and annually thereafter,the "Designated UST Operator"will min facility employees in the proper operation and maintenance of the UST systems. This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with mg"d to the leek detection equipment. <br /> > The facilityemployer's role withregard W spills and oveKlls, <br /> > Whom to contact for emergencies and lest,detection alarms. <br /> For facility employees hired on of alta July 1,2004,the initial training will be conducted within 30 days ofthc date of him. <br /> IX COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system moniloring�rclated infbrmatlon(e.g.,additional infbrmadon required by your local agency): MI5. <br /> X. PERSONNEL RESPONSIBILITIES <br /> A$OF 7/12004,THE"DESIGNATED UST OPERATOR"IDENTIFIED IN SECTION Ill OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> FACILITY FORM WILL HAVE.ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> VST SYSTEMS IN ACCORDANCE WITH 23 CCR I 2715(b,). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CER FI T10N:1 certify that the mation provided herein is true and accurate to the best of my know) e. <br /> OWTOR SIGNATURE DATE: �7 / M91. <br /> VpCI M90. ✓„�i C,I �� <br /> (� 14 ❑Operator <br /> WNEIVOPERATOR NAME(print): "9z' OWNERIOPEkATOR TITLE: Mil' <br /> (40-ey Un Only/ This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Datc: <br /> Commenb/Special Cooditioms: <br /> SJCEH"(07/03).314 07/73/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.