Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE OF ACTION I.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> `1 (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) , <br /> BUSINESS SITE ADDRESS C V tia-tl'4K r, 103. CITY -T� <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,26382641 _ <br /> MONITORING EQUIPMENT IS SERVICED 1A I.ANNUALLY ❑ 99.OTHER(Specify) 490-3i <br /> 49°-36 <br /> III.MONITO NG LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN.A 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4%4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 11 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4905 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY 14 b_LIQUID FILLED ❑ c_PRESSURIZED ❑d.UNDER VAC 49 <br /> PANEL MANUFACTURER: 490-1. MODEL#: <br /> LEAK SENSOR MANUFACTURER: 490'9. MODEL#(S): 49°'10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TOMONITOR SINGLE WALL TANK/S).(23 CCR§2643) 49o-u <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> 490-14. 49a-i5 <br /> IN-TANK PROBE MANUFACTURER: MODEL#(S): <br /> LEAK TEST FREQUENCY: . ._____a%__6 <br /> Q ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY ❑ c.WEEKLY <br /> d.MONTHLY49°.17-__. �e.OTHER�Spec�:_ <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER49-318 <br /> (S 13ecJy): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 090'20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-11 <br /> 49032 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 49x26 <br /> 49-3-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 4"29 <br /> PANEL MANUFACTURER: 490-30 MODEL#: 1 <br /> LEAK SENSOR MANUFACTURER: . 490-32 MODEL#(S): 49 33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 3ala.YES ❑b.NO 490-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ND.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TES AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 26 49036 <br /> MLLD MANUFACTURER(S): 1/m 490'31 MOD #(5 EL :q _-_-_ 49-338 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> _ELLD MANUFACTURER(S) _ _ __ 49 1. 1 MODEL#(S): _ 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490°2 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> Lj 4.PIPE INTEGRITY TESTING 49045 <br /> TEST F UENCY a.ANNUALLY b.EVERY 3 YEARS c.OTHERS i 49046490.47 <br /> 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049 <br /> •Ail w form -ng ofunburied ane en eneridor fuel piping mly W HSC 252815 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> T NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) d�S3 <br /> UPCF UST-D(12/2007)1/4 <br />