Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 450-5 n <br /> Cit 1.CONTINUOUS ELECTRONIC MONITORING El 2.FLOAT AND CHAIN ASSEMBLY El 3.ELECTRONIC STAND-ALONE A <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER:NUs9o-ss MODEL q: 'eva-ss. <br /> LEAK SENSOR MANUFACTURER: 4 S3 MODEL A(S): .g 4v 52 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES 11�.NO 49060_ <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-61 <br /> DOC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES b.NO 490. <br /> 2.UDC CONSTRUCTION IS DRI.SINGLE-WALLED ❑2.DOUBLE-WALLED °9043 <br /> IF DOUBLE WALLED: 49o-w. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: [11.LIQUID_ El2_PRESSURE 03.VACUUM__ _ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490'646 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4%:95- <br /> ------ <br /> 90-6s_ ___ LEAK DETECTION(ELD)MUST BE PERFORMED, PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED,(23 CCR <br /> C3,2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490'66 <br /> 5k3.SPILL BUCKETS ARE TESTED <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®.Alarm logs 49ocsa ❑Visual Inspection Records 490-69b ❑Tank integrity testing results 490.asc <br /> ❑SIR testing results(and supporting documentation records). 490-ii8d ❑ Tank gauging results(and supporting documentation records). 490-6se <br /> ❑ATG Testing results(and supporting documentation records).490.68r ❑ Corrosion Protection 60-day logs 490-68,, <br /> ®,Equipment maintenance and calibration records. 49o-e8n <br /> IX.TRAINING <br /> ®.Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49 69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 59 TIES UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490596 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490�9c <br /> [� CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4906% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'490-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-698 <br /> ❑ OTHER(Specify):M69b,M691 <br /> ,This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.4m 70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490.71 <br /> V/ $GL� <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The follow n person(s)are res nsible for pertonning the monitoring and equipment maintenance: <br /> NAME 49oaz TITLE 490-73 <br /> NAME 490-r4 TITLEIF 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report m the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SI(3p� 490-76 DATE: / 490-77 <br /> REPRESS TIN ❑ wr 02.F=hN0­i0r10wmtor EAL3 AuthonzedReornisminveof0mucr <br /> V APPLICANT NAME(print: 490-°s APPLICANT TITLE: 490-39 <br /> L <br /> UPCF UST-D(122007)3/4 <br />