Laserfiche WebLink
SWRCB,January 2002 " Page 3 of 1 <br /> 5. CONDARY PD'E TESTING <br /> Test Method Developed By: X Piping Itlanufacturer ❑Industry Standard 7 Professional Engineer <br /> ❑Other( city) <br /> Test Method Used: X PressuM, 0 Vacuum ❑Hydrostatic <br /> Other(Sped) <br /> Test Equipment Used: Vacuum Gage W/Nitrogc,i Equipment Resolution: .2 PSI <br /> Piping Run#1-91 Piping Run#2-87 Piping Run#3—Dsl Piping Run#4— <br /> Piping Material: Poly t Poly Poly <br /> Piping Manufacturer: APT APT APT <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: 130' 155' 155' <br /> Product Stored: 91 87 Diesel <br /> Method and location of Piping Sump Test Piping Sump Test Piping Sump Piping Sump Test <br /> piping-run isolation: Boot Boot Test Boot Boot <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min. (� 10 Min. 10 Min. 10 Min. <br /> starting test: <br /> Test Start Time: 14:40 14:40 14:50 <br /> Initial Reading(R,): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 15:40 i?' 15:40 15:50 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: 1 Hour j 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R,): 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or +/- 0 PSI <br /> Criteria: +/- 0 PSI +/- 0 PSI +/- 0 PSI <br /> _ <br /> Test Result: X Pass ❑F l X Pass ❑Fail X Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> t <br /> 1: <br />