My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:47:10 PM
Creation date
10/4/2018 2:58:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2004-2009
FileName_PostFix
2004-2009
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 " Page 3 of 1 <br /> 5. CONDARY PD'E TESTING <br /> Test Method Developed By: X Piping Itlanufacturer ❑Industry Standard 7 Professional Engineer <br /> ❑Other( city) <br /> Test Method Used: X PressuM, 0 Vacuum ❑Hydrostatic <br /> Other(Sped) <br /> Test Equipment Used: Vacuum Gage W/Nitrogc,i Equipment Resolution: .2 PSI <br /> Piping Run#1-91 Piping Run#2-87 Piping Run#3—Dsl Piping Run#4— <br /> Piping Material: Poly t Poly Poly <br /> Piping Manufacturer: APT APT APT <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: 130' 155' 155' <br /> Product Stored: 91 87 Diesel <br /> Method and location of Piping Sump Test Piping Sump Test Piping Sump Piping Sump Test <br /> piping-run isolation: Boot Boot Test Boot Boot <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min. (� 10 Min. 10 Min. 10 Min. <br /> starting test: <br /> Test Start Time: 14:40 14:40 14:50 <br /> Initial Reading(R,): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 15:40 i?' 15:40 15:50 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: 1 Hour j 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R,): 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or +/- 0 PSI <br /> Criteria: +/- 0 PSI +/- 0 PSI +/- 0 PSI <br /> _ <br /> Test Result: X Pass ❑F l X Pass ❑Fail X Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> t <br /> 1: <br />
The URL can be used to link to this page
Your browser does not support the video tag.