Laserfiche WebLink
SWRCB,January 2002 Page y of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br /> L Other(Spec) <br /> Test Method Used: ❑Pressuro_ ❑Vacuum X Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: MTS Mag Probe W/TDU,Meter Equipment Resolution: .001" <br /> Sump#.1-91 Sump#2-87 Sump#3—Diesel Sump#4— <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 41" 47" SO" <br /> Sump Material: Fiberg:ass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 20 ' 19" 19" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 18'' 17" 17" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Gond Good Good <br /> Portion of Sump Tested' 22. 21" 21" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes Elko 0 NA X Yes 0 No 0 NA X Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> product and water)?* <br /> Turbine shutdown response time 6 SeCQn, ds 7 Seconds 7 Seconds <br /> Is system programmed for fail-safe <br /> shutdown?* X Yes 0 Nn ❑NA X Yes 0 No ❑NA X Yes 0 No DNA []Yes 0 No ❑NA <br /> Was fail-safe verified to be <br /> operational? X Yes ❑Nb [INA X Yes ❑No ❑NA X Yes 0 No [INA 0 Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 M;n. 10 Min. 30 Min. 10 Min. <br /> test: <br /> Test Start Time: 1T-3 16:02 16:40 <br /> Initial Reading(Ri): 0.0GY, 0.000" 0.000" 0.000" <br /> Test End Time: 17:08 16:26 17:04 <br /> Final Reading(RF): 0.0,10" 0.001" 0.004" <br /> x <br /> Test Duration: 24 Min 24 Min 24 Min 24 Min <br /> Change in Reading(RF-R[): .00(x' -.001" +.004" <br /> Pass/Fail Threshold or Criteria: +/- .",i 4" +/- .004" +/- .004" +/- .004" <br /> Test Result: X Pass ,11 Fail X Pass 0 Fail X Pass 0 Fail 0 Pass ❑Fail <br /> Was sensor removed for testing? X Yes LI ,'i 0 NA X Yes ❑No ❑NA X Yes 0 No 0 NA 0 Yes 0 No 0NA <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> X Yes E]4,:) ❑NA X Yes ❑No El NA X Yes 0 No 0 NA Ll Yes ❑No ❑NA <br /> Comments— (include information on repairs i#6deprior to testing, and recommendedfollow-up for failed tests) <br /> i <br /> �t. <br /> yi <br /> If the entire depth of the sump is not tested,specill/how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must',Fe tested. (See SWRCB LG-160) <br /> i <br /> 9: <br />