Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folhewin checklist: <br /> ❑ Yes ❑ No* I Has all input wiring been inspected for proper critry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup'? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested:' <br /> ❑ Yes ❑ No* Was accuracy of s)stem water level readings tested`? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complicle the followinz checklist: _ <br /> • Yes ❑ No* For equipment start-up or annual equipment certification, was a Irak simulated to verity LLD performance? <br /> ❑ N/A !Check all that applvj Simulated leak rate: 0 3 g.p.h.; ❑0,1 g.p.h; ❑0.2 g.p.h. <br /> 0 Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements' <br /> 10 Yes ❑ No* Was the testing apparatus properly calibrated° <br /> ■ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ■ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> * NIA or disconnected'' <br /> ❑ Yes ❑ No* For electronic LLDs. does the turbine automatically- shut off if any portion of the monitoring system <br /> i <br /> • WA malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs. have all accessible wiring connections been visually inspected? <br /> ■ N/A <br /> 4 Yes ❑ No* Were all items on the equipment mamffacturcrs maintenance checklist completed'? �_— <br /> * to the Section H.below,ilewdbe bow and when these defciencles were or will he corrected. v <br /> ti. t'omments: <br /> page 3 of 3 atrot <br />