Laserfiche WebLink
SWRCB,January 2002 NOW Page 1 of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: 0 Spill Bucket Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> Il Other(Specify) <br /> Test Equipment Used: MTS Mag Probe W/TDU Meter Equipment Resolution 001' <br /> Spill Boz# I-91 Spill Boa#2-87 Spill Boz#3-Dsl <br /> Bucket Diameter: 11" 11" I I" <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min 10 Min 10 Min <br /> starting test: <br /> Test Start Time: 14:58 15:15 15:33 <br /> Initial Reading(Rt): 0.000" 0.000" 0.000" <br /> Test End Time: 15:10 15:27 15:45 <br /> Final Reading(RF): 0.000" 0.001" 0.000" <br /> Test Duration: 12 Min 12 Min 12 Min 12 Min <br /> Change in Reading(RF-R,): .000" .001" .000" <br /> Pass/Fail Threshold or +/-.002- +/-.002" +/-.002" +/-.002" <br /> Criteria: <br /> Test Rmk: X Pm ❑Fail X Paas ❑Fail I X Paas 0 ftH ❑ Pass 0 Fail <br /> Comments- (include information on repairs made prior to testing, and recommendedfollow-up forfailed rests) <br />