My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 3:05:06 PM
Creation date
10/4/2018 2:59:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
DSedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />S ECOR - - -- <br />Mr. James L. Barton <br />September 24, 2004 <br />Page 3 <br />CPT Boring and Sample Collection <br />One CPT boring will be advanced to approximately 60 feet below ground surface (bgs) to <br />assess soil stratigraphy and lithology. Adjacent to the CPT borehole, a second direct -push <br />borehole will be advanced to collect one discrete sample at the capillary fringe. The sample <br />will be sent under chain -of -custody documentation to Curtis and Thompkins Laboratory in <br />Berkeley, California. <br />Bench Scale Study <br />The hydrogen peroxide reagent bench -scale study will evaluate the efficiency of hydrogen <br />peroxide and measure the soil oxidant demand (SOxD). Soil and groundwater samples will <br />be mixed with a treatment of 3, 5, and 10 % hydrogen peroxide solution. <br />Extraction Well Sampling <br />A groundwater sample will be collected from well EX -1 after purging approximately three <br />casing volumes of water. Following purging, a groundwater sample will be collected. The <br />sample will be sent under chain -of -custody documentation to Curtis and Thompkins <br />Laboratory in Berkeley, California. <br />REPORT <br />After completion of fieldwork and receipt of laboratory data, a summary report will be <br />prepared. The report will include soil analytical data, chain -of -custody records, a site map <br />showing the CPT borehole and direct -push borehole locations, and conclusions and <br />recommendations. <br />SCHEDULE <br />SECOR is prepared to initiate field work within 2 weeks following approval of this <br />Bench -Scale Study by the RWQCB. A report documenting the findings of the investigation <br />will be prepared and submitted approximately 8 to 10 weeks after the completion of the field <br />work and receipt of laboratory analytical data. <br />I:\Chevron\95775\REPORTS\2004\Bench Scale Study(Mod).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.