My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:01 PM
Creation date
10/4/2018 3:59:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2010-2015
FileName_PostFix
2010-2015
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 <br /> 4f. SECONDARY PIPE TESTING *100 <br /> Test Method Developed By: 7c❑ Tank Manufacturer Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: ❑X Pressure F Vacuum Hydrostatic <br /> El Other (Specify) <br /> Test Equipment Used:gauge Equipment Resolution:0 loss <br /> Piping Ran# 1 PRE Piping Run# 2 REG Piping Run# 3 DIE Piping Rm# <br /> Piping Material: dw fiber dw fiber dw fiber <br /> Piping Manufacturer: unknown unknown unknown <br /> Piping Diameter: 311 3" 311 <br /> Length of Piping Run: 200 200 200 <br /> Product Stored: PREMIUM REGULAR DIESEL2 <br /> Method and location of sump sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 mins 5 mins 5 mins <br /> starting test: <br /> Test Start Time: 11:46 10:27 10:31 <br /> Initial Reading(Pi 3 psi 3 psi 3 psi <br /> Test End Time: 12:46 11:27 11:31 <br /> Final Reading(RF ): 3psi 3psi 3psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R[ ): 0 0 0 <br /> Pass/Fail Threshold or 0 loss 0 loss 0 loss <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.