Laserfiche WebLink
SWRCB,January 2002 *W *00 Page 4 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: +/-0.0020 <br /> Sump# 1 PRE Sump# 2 REG Sump# 3 DIE Sump# <br /> Sump Diameter: 48" 48" 48" <br /> Sump Depth: 4110" 4'11" 5-3-- <br /> Sump <br /> '3"Sump Material: fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 18" 18" 14" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 10.. 11" 1211 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good <br /> Portion of Sump Tested: t 201- 20" 16.. <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes F]Na[flN Yes❑No�N Yes ]N�N Yes F]No[]N <br /> product and water)?* <br /> Turbine shutdown response time: n/a n/a n/a <br /> Is system programmed for fail-safe [::]Yes <br /> [—]N ❑ ❑ ❑ ❑ ❑ ❑ <br /> shutdown?* Yes X N Yes N X N Yes N X N Yes No <br /> Was fail-safe verified to be E]Yes❑N�N �Yes❑No�N �YesDN�N �YesF]No�I <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 mins 5 mins 5 mins <br /> test: <br /> Test Start Time: 10:58 11:16 10:58 <br /> Initial Reading(RI): 0 0 0 <br /> Test End Time: 11:28 11:46 11:28 <br /> Final Reading(RF): -0.0000 -0.0004 -0.0003 <br /> Test Duration: 30 mins 30 mins 30 mins <br /> Change in Reading(RF-RI ): -0.0000 -0.0004 -0.0003 <br /> P"sensor <br /> /Fil Thhld or Criteria: +/-0.0020 +/-0.0020 +/-0 . 0020 <br /> for testing? X Yes NoDNA X Yes❑N NA X YesN IYes No <br /> Was sensor properly replaced and ❑ NNA X Ye �N�NA X❑Ye�NNA❑Yes❑N <br /> verified functional after testing? X ❑Ye <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> t If the entire depth of the sump is not tested,specify how much was tested.If the answer to anv of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />