My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003042
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:56:34 AM
Creation date
10/9/2018 4:26:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003042
FileName_PostFix
XR0003042
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/10/00 TUE 17:12 FAX 1 916 861 0930 SECOR-SACRAMENTO [a 016 <br />Chevron Products Company 7 <br />Eomff.cbewon 57 West Kctileman Lanc, 1_od� Caiifomin — „�,,,,_Qctgber 9 1( <br />• July 24, 2000 — A Problem Assessment Report (PAR) was submitted by <br />SECOR. <br />+ August 23, 2000 — Marty Hartzell, in a telephone conversation with Roger <br />Hoffinore of SECOR, gave approval to re -develop well EX -1 and to pump from <br />well MW-14/EX-2. Between August 23 and September 19, 2000, access <br />restrictions associated with construction activities at the site delayed the <br />implementation of these approved activities. <br />• August 28, 2000 — A Final Remediation Plan (F") was submitted by SECOR. <br />• August 31, 2000 -- Remedial piping was installed for a proposed future <br />extraction well (EX -3) to be located near monitoring well MW -1. <br />• September 19, 2000 — Wells MW-14/EX-2 (located in the southwest corner of <br />the site), MW -13 (located in the southeast comer of the site), and well EX -1 <br />were re -developed. <br />• As of September 20, 2000 (the most recent data currently available), based upon <br />the extraction rates and analytical data, G -R estimates that the SVE system has <br />removed approximately 2,349 pounds (lbs.) of TPHg, 102 lbs. of benzene, and <br />365 lbs. ofMtBE. <br />• September 22, 2000 — Groundwater extraction was initiated from well MW -14 <br />. (renamed as MW-14/EX-2). A sustainable extraction rate of approximately 0.1 <br />gallons per minute (gpm) was established for both EX -1 and MW-14/EX-2. <br />• As of September 27, 2000, based upon the extraction rates and analytical data, <br />G -R estimates that the GWE system has removed approximately 1.67 lb TPHg, <br />0.099 lb benzene, and 21.1 lb MtBE. <br />• On September 29, 2000, the field work for a capture zone evaluation was <br />performed. Preliminary data suggests measurable capture zones around both <br />well EX -1 and well MW-14/EX-2. Collected field data is currently being <br />analyzed. Findings will be reported shortly. <br />CJ <br />Operation of the soil vapor extraction and groundwater extraction systems are ongoing. <br />Groundwater is currently being extracted from wells EX -1 and MW-14/EX-2. Monthly <br />monitoring of the municipal well is also ongoing, and analytical results from this well <br />continue to show nondetectable concentrations of hydrocarbons. Additional remedial <br />well installation is proposed in the Work Plan for Additional Site Assessment/Remedial <br />Well Installation, dated October 9, 2000. This scope of work will be implemented <br />within 2 weeks of receipt of approval from the RWQCB. Because the proposed <br />remedial well installation is offsite, the RWQCB may be asked to assist in the <br />procurement of permits and offsite access to expedite installation of the proposed wells. <br />07741991.043/Octobcr 9, 2000,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.