Laserfiche WebLink
• <br />10/10/00 TUE 17:11 FAX 1 916 861 0430 SECOR-SACRAMENTO Z015 <br />Chevron Products Company 6 <br />Former Cbe=n 51adon W$775, 301 West K t i alifomia 2WO <br />RWQCB. The proposed remedial system included an oxygen diffusion system <br />around the southwest perimeter of the site (SECOR, Addendum to April 7 and <br />27, 2000, Work Flan far Remedial Well Installation and Additional Site <br />Assessment, dated April 27 And 28, 2000.) <br />• May 12; 2000 — Work plan for the installation of interim remedial groundwater <br />and vapor extraction systems was submitted. <br />+ May 19, 2000 — The RWQCB approved the installation of monitoring wells <br />proposed in the April 27, 2000 work plan, but did not approve the installation of <br />the proposed remedial wells also proposed in the April 27, 2000 work plan, nor <br />the oxygen diffusion remedial system proposed in the April 28, 2000 work plan. <br />• May 29, 2000 (awaiting G -R) — The RWQCB acknowledged the installation of <br />the interim remedial groundwater and vapor extraction systems by Gettler-Ryan <br />proposed in the May 12, 2000 work plan. <br />+ June 5, 2000 -- Construction of the interim remedial groundwater and vapor <br />extraction systems was initiated by Gettler-Ryan. <br />+ June 2000 — Marty Hartzell of the RWQCB and Roger HofSmore of SECOR <br />discussed the May 19, 2000 letter (not approving the installation of proposed <br />remedial wells). The possible use of the proposed wells as groundwater <br />extraction wells was proposed by Mr. Hoffmore. Mr. Hartzell stated that <br />pumping from wells other than EX -1 was not approved as such pumping might <br />result in the expansion of the existing plume. Mr. Hartzell agreed that if full- <br />time pumping from well ESC -1 (commenced on July 3, 2000) did not <br />demonstrate control of the plume, pumping from other wells, particularly in the <br />direction of the municipal well, would likely become necessary. <br />June 14 to July 7, 2000 — Ten groundwater monitoring wells (MW -5B, MW -8B, <br />MW- l0A and B, MW -11A and B, MW -12A and B, MW -l3, and MW -14) were <br />drilled and installed at the site by Cascade Drilling. (Monitoring wells MW -13 <br />and MW -14 were approved for installation by SJCEHD on June 20, 2000). <br />(Access agreement for the installation of wells MW -10A and B was received on <br />June 27, 2000). Monitoring wells MW -513, MW -8B, MW -108, MW -11B, and <br />MW -12B were drilled and completed to approximately 90 feet bgs. Monitoring <br />wells MW -10A, MW -11A, MW -12A, MW -13, and MW -14 were drilled and <br />completed to approximately 65 feet bgs_ <br />On July 3, 2000 — The continuous operation of the interim soil vapor extraction <br />(SVE) and groundwater extraction (GWE) remediation systems was initiated at <br />the site, approximately 2-112 months after issuance of the C&A Order by the <br />RWQCB_ <br />077.41991,04310etober 9, 2000.doc <br />