Laserfiche WebLink
Identification <br />Project #: 07743452.550 <br />Station ID #: Chevron 95775 <br />Site Address: 301 West Kettleman Lane <br />Lodi, CA <br />Lab: Kiff Analytical <br />County: San Joaquin <br />Project Manager: Ran Chinn <br />Requester: David M_ Evans <br />Client: Chevron Products Company <br />Client P.O.C: Bob Cochran <br />Date of Request: 20 -Feb -2001 <br />Field Tasks General Description <br />`4 Mw <br />a77, <br />s. �'''� �i.-� >� a ;i s+,j�.- .. 'u •� v , a�Sa ��"y�" � (.'. <br />Proiect Type <br />QX Operation & Maintenance <br />Sampling <br />1st Time Visit <br />❑ [quarterly <br />_1st _2nd _3rd —4th <br />❑ Monthly <br />Semi -Monthly <br />�X Weekly <br />One Time Event <br />Other: <br />Field Date: Wednesdays at 10 am <br />Z Sample SVE system (bag samples) according to the following schedule <br />Take bag samples on even dated Wednesda s <br />2 Sample GWE system water samples) according to the following schedule <br />Check A2proprlate Categoof <br />Q Budget Site Visit <br />Out of Budget Site Visit <br />Budget Hours: 4/6 <br />Actual Hours- <br />Mob/de Mob: 2 <br />Site Safe Concerns <br />See Health and Safety Plan <br />Armlyze samples by 8260 for oxygenates TBA, MtBE, DIPS, TAME, EtSE, ethanol, methanol, 1,2 -DCA, EDB <br />M = Monthly <br />Q = Quarlefty, Quarterly samples = Jan, ril, July, Nov. <br />3 Call site eNineer before leaving site. <br />Completed By: Date: SECOR <br />Kepueffa M5 <br />TPHgBTEX/MtBE 2x per Month <br />FID 2x p2r Month <br />2x per Month <br />2x per Month <br />Take bag samples on even dated Wednesda s <br />2 Sample GWE system water samples) according to the following schedule <br />Check A2proprlate Categoof <br />Q Budget Site Visit <br />Out of Budget Site Visit <br />Budget Hours: 4/6 <br />Actual Hours- <br />Mob/de Mob: 2 <br />Site Safe Concerns <br />See Health and Safety Plan <br />Armlyze samples by 8260 for oxygenates TBA, MtBE, DIPS, TAME, EtSE, ethanol, methanol, 1,2 -DCA, EDB <br />M = Monthly <br />Q = Quarlefty, Quarterly samples = Jan, ril, July, Nov. <br />3 Call site eNineer before leaving site. <br />Completed By: Date: SECOR <br />Kepueffa M5 <br />