Laserfiche WebLink
CJ <br />Date: <br />Technician: Steve Thompson <br />Site Engineer. David M Evans <br />PART A: GENERAL INFORMATION <br />SVEIGWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Time of Arrival <br />Ale- <br />Time <br />lr <br />Time of Departure: — <br />Was Site Engineer contacted from field? Yes/V No <br />Site Location: Chevron 95775, 301 West Kettleman Lane. Lodi. CA <br />Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower: 5 hp motor, 11,5.5. Am <br />Telemetry: S"',t a7/ <br />Electrical Power: 230 V 3 phase — 200 am <br />Supplemental Fuel: None <br />No. of K/O barrels at site: Full Empty <br />PART B. SVE SYSTEM DATA <br />1) <br />a) <br />• <br />Project No. 077.43452.550 <br />Serial No.: <br />Max AMP Raling: <br />MAX AMP Rating: <br />Elect. Meter Reading: <br />System up or down upon arrival: `' ` (If down please complete PART E) <br />Hourmeter Reading: At time: <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air vahre open <br />% Recirculation valve open <br />!Q <br />WO Content 1 <br />%b �S <br />Vacuum @ blower (in H20)/ <br />Gauge RaMe_ <br />J N <br />�`�sl <br />�� <br />blower motorfLf� <br />AMPS drawn LAMPS) <br />Tocol System Flow (d P. in H2O)Pipe <br />' <br />Jy� 25;%.�� <br />—2-5Size <br />Well Field Air Flow (A P. in H2O) <br />Pipe Size # 4' <br />Dilution Air Flow (e P, 'H2O) <br />P43e Size 4 <br />11 <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Difference <br />SIMtem ir>tiuent ore dilution <br />S tem Influent after dilution <br />System Effluent <br />Field Instrument Used: Inst Calibrated: f ..P/ <br />