Laserfiche WebLink
• <br />Chevron Products Company 2 <br />FOrnter Chevron 9-5775 301 West Kettleman Lane Lodi CA December 08, 2000 <br />GrY. <br />butyl ether (MtBE), and ethyl tertiary butyl ether (EtBE) were reported in the influent <br />sample at 0 7 ug/l, 3,300 ug/l, and 147 ug/l, respectively <br />f <br />Between October 25 and November 29, 2000, the GWE system discharged a total of <br />46,167 gallons of treated groundwater over a period of 35 days (Table 2) As of <br />November 29, 2000, the GWE system has treated a total of 73,667 gallons Calculated <br />discharge rates during the November monitoring period ranged from 0 4 to 1 19 gallons <br />per minute <br />During the November monitoring period the system extracted approximately 0 16 <br />pounds of TPHg, 0 01 pounds of benzene, and 0 68 pounds of MtBE To date, the <br />system has extracted approximately 2 52 pounds of TPHg, 0 11 pounds of benzene, and <br />25 74 pounds of MtBE <br />System Modifications <br />/ Weekly operation and maintenance was not performed on November 15, and 21, 2000, <br />due to the performance of an aquifer test and system modification associated with the <br />installation of groundwater extraction well EX -3 System modifications and aquifer test <br />parameters are summarized as follows <br />• Between November 10 and 15, 2000, the system was shutdown to monitor <br />changes in groundwater elevations in site monitoring wells <br />• On November 16, 2000, a 2 -inch pump was installed in extraction well EX -3 <br />Groundwater was pumped and treated from EX -3 for approximately 2 -hours <br />• On November 17, 2000, a step test was performed in EX -3 Groundwater was <br />pumped and treated for approximately 5 -hours <br />• On November 18, and 20, 2000, the 2 -inch pump in EX -3 was upgraded to a 3 - <br />inch and a new transfer pump was installed in the remediation compound The <br />GWE system was then tested for approximately 3 -hours <br />• Between November 22 and 26, 2000 groundwater was continuously pumped <br />from EX -3 to monitor drawdown effects in site monitoring wells <br />• On November 27, 2000, the system was shut down to monitor groundwater <br />elevation recovery following the pump test <br />• On November 28, 2000, GWE resumed from EX -1, MW-14/EX-2, and EX -3 <br />077 41991 043/Discharge Report doc <br />44 <br />