fact have invoices for the new batteries. The facility has requested that the supplier document that the <br />core was replaces with a replacement new battery for the future. The invoices are being obtained and <br />can be supplied by 3.15.16 to EHD. <br />301. Pump was fixed and oil cleaned up and properly disposed of in a drum maintained and labeled on <br />site, Material will be properly disposed of as required by regulations. <br />303. The oily liquid was properly cleaned and the control equipment is being properly maintained. If any <br />spill occurs into the containment in the future it is to be cleaned up immediately. <br />403. All liquids have been cleaned as required and all containers are to be kept closed except adding or <br />removing hazardous waste. <br />601. Waste absorbent to be properly disposed of. The 30 gallon drum of metal fines was empty and has <br />been empty for some time. To the best of my knowledge it appears the 1.3.2012 start date was <br />incorrectly put on the drum under the assumption that there would be metal fines to place in the drum. <br />The facility is in fact going to initiate a start date as metal fines if any are placed in the container. Waste <br />hauler contacted but has not arrived to pick up material. As soon as they do we will submit a manifest to <br />EHD by 3.15.16. <br />605. Containers labeled and all waste properly disposed of as regulations require. Pickup of the <br />materials has been ordered for the waste hauler but they have not shown up yet. As soon as they arrive <br />we will submit the manifest to EHD. No later than 3.15.16. <br />608. Drained is included on the drained used oil filters and all are properly labeled and stored, <br />Aboveground petroleum Storage Act Inspection Report <br />604. Alta Environmental was contracted to completely revise the SPCC plan. They conducted a site visit <br />on 2.29.16. The SPCC plan revisions are not final but are expected to be complete by 3.22.16. Item # 604 <br />is included to be revised as part of the SPC revision. <br />609 & 706. All 55 gallon drums have containment capable of holding S5 gallons and the SPCC plan is <br />being revised to show that. The SPCC plan revisions are not final but are expected to be complete by <br />3.22.16. <br />713. Visual inspections were in fact conducted as required by the SPCC plan in place. The SPCC plan is <br />being revised and once that is complete inspection will be conducted as stated in the plan. The SPCC <br />plan revisions are not final but are expected to be complete by 3.22.16. <br />716. Liquid level device was installed per CFR 112.6. Testing to be complete once inspection schedule is <br />documented in revised SPCC plan. Upon immediate implementation of approved and final revised plan <br />procedures and frequency of testing will be documented and maintained on site. <br />